My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/24/2024 ZONING BOARD OF APPEALS Minutes
>
01/24/2024 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2024 5:00:20 PM
Creation date
2/16/2024 8:53:55 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
01/24/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> JANUARY 24,2024 <br /> 29 Echo Road and 41 Echo Road: Petitioner, 3M Ventures, Inc., d/b/a Triple M Management <br /> Company, LLC requests a modification under §174-24 (C) (9) (c) (e) of the Zoning Bylaws, and <br /> condition#5 of the Special Permit Decisions: SP-2015-33; SP-2019-36; SP-2020-28;MOD-2023- <br /> 08 to extend the date for completion of construction from its previously extended date of December <br /> 31, 2023 to May 31, 2024 on property located in the 1-1 and Light Industrial Overlay Zoning <br /> Districts, Map 19 Parcels 3-8 and 3-9, Mashpee, MA. (Owner of record: Triple M. Management <br /> Company, LLC.). (Continued from December 13, 2023 hearings at the request of the Attorney). <br /> Attorney Christopher Kirrane represented the applicant's request for a continuance of the <br /> modification. The Board wanted to receive definitive comments from both Mr. Morris, Building <br /> Commissioner and Mr. Phelan, Fire Chief. <br /> Attorney Kirrane stated he had a discussion with Mr. Morris and reviewed the Project Status & <br /> Schedule which he believes is 99% accurate except for the issue of the wing structures. He is <br /> deferring to Mr.Morris' recommendations of the wing structures,and his client is willing to accept <br /> his recommendations. If the Board is willing to accept the modification with the condition and in <br /> accordance with Mr. Morris' recommendations. The time line of the project would require to get <br /> the work completed by the end of May. During that time, Mr. Morris' will request a demolition <br /> permit to remove the wing structures before issuing an occupancy permit, and within 7-days of <br /> that occupancy permit,the wings will be torn down. <br /> Mr. Morris stated for the record that the Project Status & Schedule Report dated January 19, 2024 <br /> is not accurate under the Special Permit SP-2019-28, Condition numbers 5, 6, and 7. The <br /> recommendations are that the buildings needs to be sprinkled before an occupancy, a permit needs <br /> to be in hand,the wings need to be vacated, and will require to remove the wing structures entirely <br /> within 7-days after the issuance of the certificate of occupancy. <br /> Mr. Phelan stated his primary concerns are Condition 6 & 7. The (CCC) Cannabis Control <br /> Commission will not do their inspection until they receive a Certificate of Occupancy. He stated <br /> that he cannot sign off on the demo permit until all the utilities are disconnected. He did receive <br /> sprinkler plans for both the main building and the new addition that meets code requirements. The <br /> issue is that the wing structures require a sprinkler system because they are attached to the main <br /> building, but will be torn down. Mr. Phelan believes this is a hardship for the applicant because <br /> they would require to reconfigure the entire sprinkler system. Mr. Phelan said that he would be <br /> able to sign off on the demo permit when all the utilities are disconnected, and agrees with the <br /> Building Commissioner to comply with the original special permit conditions.However,there may <br /> be a delay with the CCC. <br /> The Board wanted to know what needs to be done to be compliant. Mr. Phelan stated that the main <br /> building is already sprinkled but is not functioning, but the sprinkler system can be installed in the <br /> new addition fairly quickly, and tested within two-three days. <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.