Laserfiche WebLink
r <br /> Roll Call Vote: <br /> Alex Zollo (YES) <br /> Marjorie Clapprood (YES) <br /> Sandra Godfrey (YES) <br /> Steve Cook (YES) <br /> Erin Copeland (YES) <br /> Paul Colombo (YES) <br /> 6— 0 Unanimous <br /> 6:33 199 Daniels Island Road, David Elkinson, Trustee, Daniels Island Realty Trust. NOI <br /> Proposed reconfiguration of existing ramp and float. Representative: Mike Borselli, <br /> Falmouth Engineering, Inc. (Resource Areas: (Land Under Ocean, Co„ nta�r. . <br /> '��ng <br /> ShelIIfish. Mr. Borselli described the project details for enlarging existing float to 200 sq ft <br /> and reorienting the float from a T configuration to a straight line configuration in order to <br /> achieve suitable depth at low tide (piles to be reconfigured as well). Shellfish constable <br /> recommends a $2,340.00 shellfish mitigation fee based on calculated disturbances to <br /> shellfish habitat and shellfish species present at the project locus. Fee must be paid prior to <br /> dock construction. Mr. Colombo asked for comments amongst the commissioners. No public <br /> comments. <br /> Motion to Close the Public Hearing and Issue Order of Conditions : Steve Cook <br /> Motion seconded: Alex Zollo <br /> Discussion: none <br /> Roll Call Vote: <br /> Alex Zollo (Yes) <br /> Erin Copeland (Yes) <br /> Steve Cook (Yes) <br /> Sandra Godfrey (Yes) <br /> Erin Copeland (Yes) <br /> Paul Colombo (Yes) <br /> 6— 0 Unanimous. <br /> ** Mrs. Clapprood excused herself from the meeting. There is still a quorum of <br /> commissioners for the remainder of the meeting agenda** <br /> 6:36 17 Monomoscoy Road West, Biria D. and Elaina C. St. John, Trustees, Biria St. John NOI <br /> Trust. Proposed raze and replace of single family dwelling, IA septic upgrade, attached <br /> garage, landscaping, hardscaping and mitigation plantings. DEP file # 43-3265. <br /> Representative: Falmouth Engineering, Inc. j e OLNr e Areas: L CS , IbUffe r zone 'to <br /> ACEC, 1BVW and sall4 iY airsL. Mr. Borselli described the proposal with Mr. Andrew Garulay <br /> (Landscape Arch itect-Yarm o uth port Design) and Attorney Brian Wall. Mr. Borselli noted that <br /> this property was issued a previous order of conditions in 2016 for a similar proposal. Mr. <br /> Borselli described the septic upgrade to an Innovative alternative system with the best <br /> available technology for nitrogen reduction (Nitro-system). Reduction in overall lawn area <br /> and mitigation plantings. Some proposed alteration of naturally vegetated areas. Mr. Borselli <br /> acknowledged that the plan will be revised to reflect both the 75 ft and 150 ft buffer setbacks <br /> but it won't change the project scope. Mr. Borselli presented additional details of the <br /> proposed septic system/leach field as shown on the plan. Mr. Garulay detailed the <br /> landscaping, hardscaping and mitigation plantings.Attorney Wall detailed the waiver request <br /> and the criterion for consideration. <br /> Mr. Cook asked about proposed square footage increase in living space in the home and <br /> square footage of clearing for the leaching field. Mr. Borselli and Mr. Garulay provided <br /> additional details. Mr. Cook asked about the 150 ft delineation in the area of the septic <br /> system and how that may affect the mitigation. Additional conversation ensued about timing <br />