Laserfiche WebLink
<br /> <br /> <br /> <br />6:27 <br /> <br />COC <br /> <br />John Kabat, 108 Edgewater Road. Request for Certificate of Compliance 43-2993. <br /> <br />Representative: Homeowner. <br /> <br /> <br />6:30 <br />COC <br />Jack Foster, Allyson Poole-Foster & Lauren C. Foster, 31 Wheelhouse Lane & 5 <br /> <br /> <br />Waterline Drive North. Request for Certificate of Compliance 43-3065. Representative: <br /> <br />Cape & Islands Engineering, Inc. <br /> <br /> <br /> <br /> <br />6:33 <br />NJCJ, LLC, 21 Metacomet Road. Request for Certificate of Compliance 43-2964. <br />COC <br /> <br />Representative: Falmouth Engineering, Inc. <br /> <br /> <br /> <br />NOI: Notice of Intent <br />NOI-LERP: Notice of Intent for Limited Ecological Restoration Project <br />RDA: Request for Determination of Applicability <br />COC: Certificate of Compliance <br /> <br />PRE/POST-HEARING AGENDA: <br /> Vote: Certificate of Authorization Vote <br />Mr. Smith motioned that the Board vote to authorize the Chair, or in the Chair’s <br />absence, the Vice-Chair, to execute and endorse all decisions, permits, approvals, <br />plans, orders, instruments, or other documents of whatever nature on behalf of <br />and as duly authorized agent for the Mashpee Conservation Commission. <br />Ms. Zollo seconded the motion. <br />7-0-0 <br />Roll Call Vote: <br />Mr. O’Neill; yes <br />Mr. Colombo;yes <br />Mr. Sweet; yes <br />Mr. Smith; yes <br />Mr. Weeden; yes <br />Ms. Zollo; yes <br />Mr. Dalton; yes <br />In favor, 7; Opposed, 0; Abstentions, 0 <br /> Updates: <br />o Red Brook Road culvert <br />Horsely Witten Group was hired by DER (Division of Ecological Restoration) as <br />the official consultant and will begin work on assessing existing conditions and <br />creating a conceptual restoration plan soon. <br />o Upper Quashnet restoration <br />Horsley Witten Group is finalizing the 3 alternative concepts, we should be seeing <br />that in about a month. <br />o Bylaw Review subcommittee (Discussion on proposed amendments to Regulation <br />12-Mitigation and Regulation 27-Docks, Piers and Floats) <br />Agent previously sent out the proposed changes. They are still working on <br />finalizing some of the mitigation calculations. He wanted to note that we want to <br />emphasize mitigation is the last option, after all other options to reduce impacts <br />must be considered. <br />o Johns Pond Milfoil <br />Follow up survey to be done in the spring. We plan to submit an article for the <br />spring Town Meeting to fund additional invasive species surveying and treatment <br />on Santuit Pond <br />o Chop Chaque Bog <br /> Draft bid documents for Phase 2 final design and permitting have been reviewed <br /> <br />