My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/11/2024 SELECT BOARD Minutes
>
03/11/2024 SELECT BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2024 5:00:40 PM
Creation date
4/11/2024 9:53:59 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SELECT BOARD
Meeting Document Type
Minutes
Meeting Date
03/11/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4 <br /> Select Board <br /> Minutes <br /> March 11, 2024 <br /> APPOINTMENTS & HEARINGS <br /> DPW Director Catherine Laurent:,Recommendations for Award ofthe Following Contracts: <br /> HVAQ Vhgrq&s at_the KC Coombs School: <br /> Catherine Laurent, Director of Public Works was in attendance to recommend the Select Board award a <br /> contract to Performance Plumbing& Heating, Inc. of Medway, MA in the amount of$1,518,824 for HVAC <br /> upgrades to the Kenneth C. Coombs School. The quote includes fees for the required filed sub-bids. <br /> Ms. Laurent indicated that this firm was the lowest most responsible bidder for the project. The firm is <br /> DCAMM certified receiving a 93% evaluation rating for completed projects. With approval-it is anticipated <br /> that work would begin in late June after the school term with project completion in the fall. <br /> Motion made by Selectman Sherman to award a contract to Performance Plumbing& Heating,Inc. in <br /> the amount of$1,518,824 as recommended. <br /> Motion seconded by Selectman O'Hara. <br /> VOTE: 5-0. Unanimous. <br /> Roll Call Vote: <br /> Selectman Cotton,yes Selectman Sherman,yes Selectman O'Hara,yes <br /> Selectman Weeden,yes Selectman Wyman-Colombo,yes Opposed, none <br /> Owner's Project ManA ere OPM „mServiceswfor Mashpee School HVAC Proiects: <br /> It is the recommendation of the DPW Director to award a Negotiated Contract Fee for the Owner's Project <br /> Manager(OPM) Services for Mashpee School HVAC projects. The fee shall not exceed $285,000. The <br /> reimbursement limit is up to $8,000 for use of an online bidding service, and the reimbursement limit of up to <br /> $20,000 is limited for an independent estimating firm to prepare a construction estimate. The Town will work <br /> on the selection of an engineer/designer, and in moving forward to construction at the two schools. <br /> Anser Advisory of Boston, MA is the recommended OPM. Payment would be made on a monthly basis based <br /> on actual hours worked for the project team members. The OPM is required by State statute. The proposed <br /> project tern is March 18, 2024 through December 31, 2025. <br /> It is likely the Town would receive rebates to offset costs. <br /> The scope of services does not include a Clerk of the Works. <br /> Motion made by Selectman Sherman to award a Negotiated Contract Fee for the Owner's Project <br /> Manager(OPM) Services to Anser Advisory for the (2) Mashpee School HVAC projects. <br /> Motion seconded by Selectman O'Hara. <br /> VOTE: 5-0. Unanimous. <br /> Roll Call Vote: <br /> Selectman Cotton,yes Selectman Sherman,yes Selectman O'Hara,yes <br /> Selectman Weeden,yes Selectman Wyman-Colombo,yes Opposed, none <br />
The URL can be used to link to this page
Your browser does not support the video tag.