MASHPEE ZONING BOARD OF APPEALS
<br /> DECISION FOR A SPECIAL PERMIT
<br /> Owner, Chapter Closed LLC
<br /> Petitioner, Pastore Excavation, Inc.
<br /> 50 Evergreen Circle, Map 19, Parcel 10-5
<br /> Mashpee, MA 02649
<br /> SP-2023-60
<br /> -A split rail fence be installed along the north and west parking area where it is developed.
<br /> -The building will have a sprinkler system installed.
<br /> -The plans be amended to adequately show the number of contractor bays.
<br /> SPECIAL PERMIT CONDITIONS
<br /> In view of the foregoing,the Board determined the Petitioner met the criteria for a Special Permit.
<br /> Upon motion duly made and seconded at the Public Hearings on Wednesday, November 8, 2023
<br /> the Zoning Board of Appeals voted unanimously to issue a Special Permit to Owner, Chapter
<br /> Closed LLC, Petitioner Pastore Excavation Inc, under §174-25; §174-25 (G) (14); §174-24 (C)
<br /> (2); §174-45.6; §174-37, and §174-41 (M)of the Zoning Bylaws to allow for construction of 9,672
<br /> sq. ft. contractor bay warehouse metal building on property located in the I-1 and Light Industrial
<br /> Overlay District, at 50 Evergreen Circle, Map 19, Parcel 10-5, Mashpee, MA with the following
<br /> conditions:
<br /> 1. The Board has determined that the applicant meets all the conditions of a Special Permit
<br /> under Mass General Law 40A Section 9.
<br /> 2. Proposed Site Development Plan,Prepared for:Nicholas A. Pastore,Project: 50 Evergreen
<br /> Circle. Mashpee, MA, date: August 30, 2023. Sheet l: Cover Sheet, Sheet 2: Existing
<br /> Conditions, Sheet 3: Layout and Landscape Plan, Sheet 4: Grading & Utility Plan, Sheet
<br /> 5: Septic Plan, Sheet 6: Photometric Plan, Sheet 7: Construction Details. Rev. Date:
<br /> 10/10/23: Revisions Per Site Plan and Design Review. Stamped and signed by: Mark D.
<br /> Dibb, Professional Engineering, No.: 45937. O&M Plan Dated: October 24, 2023 signed
<br /> by Applicant. Storm Water Management Report and Design Calculations, Dated: August
<br /> 29, 2023, Rev 1: October 10, 2023. Rev.: 10/24/23: Misc. Revisions Per 10/21/23 Peer
<br /> Review. 11/02/23: Coordinate Tree Size Notes.
<br /> 3. Floor Plan—Project Name: Pastore Excavation, 50 Evergreen Circle,Mashpee,MA. Date:
<br /> 5/12/23, Scale: 1/8" = 1', Prepared by: Priggen Steel, Wrentham, MA. Stamped by:
<br /> Theodore C. Greenlaw Professional Engineer No. 29093. S-1: Floor Plan, S-2: Elevation,
<br /> S-3: Foundation, S-4: Details, S-5: Roof Framing, S-6: Cross Section.
<br /> 4. Conditioned on all Town Department comments read into the record including but not
<br /> limited to the Board of Health and Conservation Department Comments.
<br /> 5. Conditioned on the comments and recommendations submitted by Pesce Engineering peer
<br /> review in his written reports dated October 21, 2023 and October 26, 2023.