My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/13/2023 ZONING BOARD OF APPEALS Minutes (2)
>
12/13/2023 ZONING BOARD OF APPEALS Minutes (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2024 5:13:30 PM
Creation date
4/12/2024 4:19:10 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
12/13/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> DECISION FOR A SPECIAL PERMIT <br /> Owner, Brendon P. Giblin <br /> 90 Popponesset Island Road, Map 106, Parcel 34 <br /> Mashpee, MA 02649 <br /> SP-2023-67 <br /> Mr. Furbush asked Mr. McManus to explain the processes and obligations of the Commission and <br /> how it relates to the State's obligations. <br /> Mr. Drew McManus, Conservation Department Agent addressed the Board. He stated that the in <br /> some cases the Town Bylaw vs. the State, is afforded a higher level of protection under the <br /> wetlands protection act regulations, and enforcement in certain situations such as flood zone, <br /> coastal bank,and inland bank because the State does not have any standards regarding land subject <br /> to coastal storm flow. The appeal on this particular project has no standards at the State level in <br /> regard to coastal storm flow. The local order of conditions was not filed in time because there was <br /> a misunderstanding that the 21-day appeal period starts at the close of the public hearing. He <br /> explained that the vote was taken two weeks later, and thought the 21-day appeal started after the <br /> vote of the actual decision. <br /> The Conservation Department comments dated January 23, 2024 were read into the record. Mr. <br /> Reidy read a letter dated December 26,2023 from(DEP)Department of Environmental Protection <br /> to Watsky Law (to summarize); "The proposed project will result in an improvement over the <br /> existing site conditions. A non-flood compliance house will be replaced with a new house in <br /> accordance with the Massachusetts ,State Building Code standards for Flood Resistant <br /> Construction. " <br /> Chairman Bonvie confirmed for the record that the Board members read the written remarks <br /> provided by Mark Dibb, Cape and Islands Engineering, dated January 16, 2024. <br /> The Town Planner's recommendations dated December 6, 2023 were read into the record. Mr. <br /> Reidy stated for the record that Mr. Dibb provided his response to Mr. Lehrer's comments noting <br /> that; "including the pool, the lot coverage is still below 20%., per the superseding order of <br /> conditions, the applicant has agreed to use pervious pavers for the patio area. " <br /> The Board of Health Agent comments dated January 22,2024 were into the record; "Septic is only <br /> designed for four bedrooms, plans show three bedrooms in main house second floor, and one <br /> bedroom above garage this is compliant. " <br /> Chairman Bonvie asked for further comments from the Board/audience. <br /> Mr. Dibb said that Cape & Islands provided a flood plain flow path analysis of the flood water <br /> under existing and proposed conditions. He said that there is adequate flood storage capacity on <br /> this site, and is not actually a requirement in the wetlands protection act. The only change that was <br /> required is to provide pervious pavers. <br /> Mr. Goldstein asked if the pervious pavers should be added as a condition. The Board determined <br /> that the pavers were included on the Site Plan. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.