My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/17/2023 SEWER COMMISSION Minutes
>
07/17/2023 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2024 5:00:31 PM
Creation date
4/16/2024 3:34:01 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
07/17/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4 <br /> Mashpee Select Board-Sewer Commission <br /> Minutes <br /> July 17, 2023 <br /> Discussion, Approval of Comprehensive Watershed Nitrogen Management Plan ("CWMP") Phase II or <br /> Modifications: Presentation by the Town Manager and GHD, Inc. of options for Joint Review, Modifications <br /> and Approval: (continued) <br /> Option#g: Removes nitrogen load from properties, more immediate nitrogen removal impact, <br /> Provides artery to future northern sewer sheds including Mashpee-Wakeby & Santuit Ponds, <br /> Portion of sewer in Santuit Pond watershed. <br /> Requires complex permitting process to increase recharge capacity. <br /> Would require Town assistance. <br /> The menu of the (9) different options was considered and weighed upon for matters of importence such as <br /> cost, connection, impact, density, phasing, effectiveness, efficiency, benefit, the urgency for clean waters and <br /> the overall tax burden. <br /> Guidance was requested from the project engineers GHD, Inc. as the deadline for the SRF application of <br /> August 11, 2023 is impending. In response, it was stated that all areas have to be done, and the Town needs <br /> to think of the order as the cost of the options are fairly different. <br /> As the options were debated it was agreed option #g which includes option 44 and Portions of Phases 3 & 4 <br /> is highly advantageous. This option gives the biggest bang for the buck as it would focus on the largest <br /> amount of nitrogen and the largest amount of properties, 1288 at a projected cost of$8 8 million. The <br /> efficiency rate is noted to be go%. <br /> Cost considerations were diligently examined. It was noted the Town of Yarmouth recently submitted an <br /> application for SRF funding in the amount of$207 million. The funding was capped at $50 million per year. <br /> Cost assumptions were considered. The burden to the taxpayer with an average value property of$665,000 <br /> borrowing $53 million per year would result in an estimated increase of$152 in taxes per year. If the <br /> borrowing was doubled at $106 million it would be essentially an increase of$304 per year, less than $1 per <br /> day for an average assessed property. <br /> Each option was given careful consideration as the matter was studied. In an effort to move forward, several <br /> options were eliminated from the discussion. From a technical standpoint GHD indicated that all options are <br /> necessary and the Town cannot make the wrong choice. <br /> Additional comment was received from Andrew Gottlieb who stated there is no bad investment. Mashpee <br /> residents are deeply concerned with the rapid decline of water quality and it is highly likely the Town would <br /> receive approval by a vote of Town Meeting to move forward. Although the average loan is $50 million, the <br /> Town if approved would be locked into the requested amount granting certainty. There would be no need to <br /> reapply for the additional funds. And, with approval of the SRF loan at o%there are other funding <br /> opportunities to assist the Town. This includes principal forgiveness from the Cape & Islands Water <br /> Protection Trust, additional State water funding, the WIIF, and the short-term rental tax. <br /> It was explained this is Year 2 of a 5 Year precedent. It was recommended the Town advance a large project <br /> now to meet the objective for better water in Mashpee. This is an environmental need. <br />
The URL can be used to link to this page
Your browser does not support the video tag.