My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/01/2021 SEWER COMMISSION Minutes
>
02/01/2021 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2024 5:00:31 PM
Creation date
4/17/2024 11:54:40 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
02/01/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2 <br /> Board of Selectmen <br /> Minutes <br /> February 1, 2021 <br /> Present: Selectman John J. Cotton, Selectman Thomas F. O'Hara, Selectman Carol A. Sherman, <br /> Selectman Andrew R. Gottlieb, Selectman David W. Weeden <br /> Town Manager Rodney C. Collins <br /> Assistant Town Manager Wayne B. Taylor <br /> Meeting Called to Order by Chairman Cotton at 6:34 p.m. <br /> Mashpee Town Hall, waquoit Meeting Room <br /> MINUTES <br /> Monda Janua 11 2021 Re ular Session: <br /> Motion made by Selectman Gottlieb to approve the minutes of Monday,January 11, 2021 as <br /> presented. <br /> Motion seconded by Selectman O'Hara. <br /> VOTE: Unanimous. 4-0--1. <br /> ........... <br /> Roll Call Vote: <br /> Selectman Cotton,yes Selectman O'Hara,yes Selectman Sherman, yes <br /> Selectman Gottlieb,yes Selectman Weeden, abstained opposed, none <br /> APPOINTMENTS & HEARINGS <br /> Public Comment: None at this time, <br /> CONVENE JOINT MEETING WITH TH.E SEWER COMMISSION <br /> 6:37 p.m. The Sewer Commission meeting was Called to Order. <br /> In attendance was Tom Fudala, Joe Lyons,Ken Dunn,Mike Rapacz, and Anne Malone <br /> Discussion of wastewater Plan: <br /> The Board of Selectmen met in joint convention with the Sewer Commission for the purpose of reviewing <br /> matters associated to Phase 1 of the Water Resource Recovery Facility; pump stations and collection <br /> system schedule and design including the broader scope of the wastewater plan for the Town of Mashpee. <br /> Tom Fudala, Sewer Commission Chair outlined the project timeline which adheres to the Clean water <br /> State Revolving Fund(CWSRF) schedule and application thereof submitted in advance of the MassDBP <br /> solicitation deadline for new projects. <br /> Final design is ongoing. Survey work and site borings for the collection system and pump stations are <br /> being conducted for the purpose of testing the site locations. It is anticipated the'75% design submittal <br /> would be achieved in mid-March. This phase will develop the basis for cost estimates to be incorporated <br /> into a May Town Meeting article in addition to an article authorizing a Flow Neutral Bylaw. A Ballot <br /> Question to authorize a debt exclusion for bond authorization is also a requirement for this project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.