My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/12/2023 SEWER COMMISSION Minutes (2)
>
01/12/2023 SEWER COMMISSION Minutes (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2024 2:24:53 PM
Creation date
4/17/2024 2:24:05 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
01/12/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Construction Update with Interim Town Engineer, Ray Jack. <br /> <br />Mr. Jack stated that there are 3 active contracts. <br /> <br />Contract 1 is The Water Resource Recovery Facility which is being constructed at the existing transfer station. <br />Contract 2 is the Northern segment of the collection system above Route 28. <br />Contract 3 is the Southern collection system which is South of Route 28. <br /> <br />For the month of October there was very little activity at the plant and at the collection systems. Construction <br />started in earnest in November. <br /> <br />Mr. Jack will be providing a cost update at the next Sewer Commission meeting which will consist of the <br />original contract value, the adjusted contract value (the original cost plus any change orders or additional <br />costs that may be incurred) and the actual payment value (what the contractor has received). <br /> <br />Work has been continuing on the main installation for the collection system North along Carleton Drive. It is <br />the deepest part of the main in that area. It was running in the 12 – 15’ range on the trenches. They are <br />presently doing the last leg of Carleton and they should be completed tomorrow. That’s roughly 2,000’ of <br />total trunk main installed since the project began. 8” main and services are complete on Swain Circle and the <br />main and services for Sea Oaks are scheduled to begin in early February. <br /> <br />Collection system South work began at the intersection of Mashpee Neck Road and Simon Narrows Road on <br />rd <br />January 3. The first manhole was installed at the intersection and the main installation is proceeding along <br />Simon Narrows Road. Installation will stop in the vicinity of Yardarm Drive which is the end point of the <br />contract. They will be starting work on Falmouth Road, hopefully in March, in order to take advantage of <br />seasonal restrictions. It is a State Highway with a limited timeframe and the Town must follow the State <br />Guidelines. <br /> <br />The site for the water resource recovery unit has been cleared and stumps have been removed. Materials <br />have been delivered to the site. The current work is focused on earth moving. Approximately, 8,000 cubic <br />yards of material has been moved off site. Excavation for the building and tank foundations will commence in <br />February. Concrete and underground pipework will continue through the summer months. <br /> <br />Meredith Harris inquired about a “field trip” by the Commission to the sites. Mr. Jack stated that there isn’t <br />anything to see at the plant site at the present time and he will be more than happy to start scheduling site <br />visits. <br /> <br />Correspondence: <br />None at this time. <br /> <br />Other items not reasonably anticipated by the Chair: <br />None at this time. <br /> <br />Next meeting: <br />January 26, 2023, 2:00PM <br />Mashpee Town Hall <br />Waquoit Meeting Room <br />16 Great Neck Road North <br />Mashpee, MA <br />3 <br /> <br /> <br />