My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/23/2024 CONSERVATION COMMISSION Minutes
>
05/23/2024 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2024 5:00:37 PM
Creation date
7/29/2024 8:47:41 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
05/23/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
o Q: What is the age of the tank itself and will the pump out for the tank be <br /> covered? <br /> ■ A: The septic tank is between 4 and 5 years old, and pumping will <br /> be done through the first manhole, which will be left uncovered. <br /> • The locust map is incorrectly labeled. <br /> o The representative has assured this will be revised and resubmitted. <br /> PUBLIC COMMENTS <br /> There are no public comments. <br /> AGENT COMMENTS <br /> • The overall project is good as it involves reducing the lawn area,hardscaping, and <br /> retaining wall. <br /> • Confirmation confirms that the sonotubes are not placed over the septic tank. <br /> • New deck and stairs proposed over existing landscape and hardscape with no <br /> removal of any native vegetation. <br /> • No proposed grading or changes to existing topography. <br /> • The deck will be set on sonotubes, with no vertical walls proposed, and minimal <br /> fill will be used in the areas occupied by the deck supporting sonotubes. <br /> • Proposed project does not require mitigation per the provisions under Regulation <br /> 25 (LSCSF). <br /> • The project narrative includes a waiver request under Regulation 25 Section C-7- <br /> C setback requirements. <br /> Rationale: The proposed activities have minimal impact on the lot's existing <br /> conditions and do not significantly affect the standards of Land Subject to Coastal <br /> Storm Flowage for landlocked lots like this one. <br /> Board of Health: To avoid damage to septic tank, recommend a minimum of 5' setback from <br /> sonotubes. Access to septic components roust be maintained. Note the location of the septic <br /> system and restrict equipment/vehicle traffic over non-load bearing (H-10) components. <br /> Building: Application filed with ZBA, date to be determined. <br /> Motion made by Mr. Cook for a negative determination with project presented as is and <br /> with the corrected locus address. Motion seconded by Ms. Copeland. No further discussion. <br /> • Roll Call: Mr. Cook(Yes), Ms. Thombrugh (Yes), Ms. Godfrey (Yes), <br /> Ms. Copeland (Yes), Mr. Colombo (Yes). <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.