My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/25/2024 CONSERVATION COMMISSION Minutes
>
07/25/2024 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2024 5:00:28 PM
Creation date
11/12/2024 9:37:29 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
07/25/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The motion passes unanimously <br /> Documents provided: Falmouth Engineering, Inc. Notice of Intent application and project <br /> narrative; May 28, 2024, Plan "Site Plan—Proposed Bulkhead". <br /> :3 <br /> NOI 43-3301 <br /> 4 Pond St, Samuel Peter Delois and Patricia Jean Delois. Proposed raze and replace of <br /> a single-family dwelling with associated utilities in the same footprint,rebuild driveway, front <br /> porch, and front stoop, addition of I/A septic system component, landscaping, and mitigation <br /> plantings. Representative: Baxter-Nye Engineering <br /> Representative: Mathew Eddy <br /> Proposed Project Overview: <br /> Existing Property: <br /> 1. 3 bedrooms, 1 story <br /> 2. Full basement(1452 sqft) <br /> 3. Total lot structural coverage: 1964 sqft <br /> Proposed Property: <br /> 1. 2 stories, 3 bedrooms <br /> 2. No basement <br /> 3. Footprint: 2762 sqft(first floor: 1322 sqft,raised to elevation 13.5; second floor: 1440 <br /> sqft) <br /> 4. Structural footprint reduced by 38 sqft <br /> 5. Lot coverage reduced by 210 sqft(total: 1754 sqft) <br /> Site Details: <br /> 1. Lot size: 0.18 acres <br /> 2. 150' buffer to Dean's Pond <br /> 3. Located in a flood zone (elevation 12) <br /> 4. Coastal storm flowage <br /> 5. R3 Zoning, Popponesset Overlay District <br /> Environmental Considerations: <br /> 1. Board of Health approved VA system (July 17, 2024) <br /> 2. ZBA hearing scheduled for August 14, 2024 <br /> 3. Drywells for roof runoff <br /> 4. Septic system remains in the same location <br /> 5. Nitrogen loading after improvements: 10.9 mg/liter <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.