Laserfiche WebLink
o Additional mitigation will be completed where the 25ft gravel path is being <br /> removed. <br /> • Two trees (a 24ft oak and an 18in pine) are proposed for removal and will be <br /> replaced. <br /> o Consideration will be given to additional mitigation. <br /> o The Agent suggests a waiver request under Regulation 25. <br /> COMMISSIONERS COMMENTS <br /> • Stormwater Management Plan: <br /> o Currently, none <br /> o Drain system with leaching field proposed. <br /> PUBLIC COMMENTS -None <br /> AGENT COMMENTS <br /> • Recommends a separate mitigation plan dedicated to those details and specifics only. <br /> • Details to be added: stormwater runoff and rinse station water drainage. <br /> • Additional recommendations: <br /> o The submittal of a signed 2 year mitigation monitoring contract between the <br /> homeowner and a qualified professional and the revised mitigation plan. <br /> ➢ BOARD OF HEALTH: The existing on-site conventional septic system can <br /> accommodate a maximum of three (3) bedrooms. No increase in flow was proposed. <br /> Setbacks from the tank and SAS must be maintained, or a variance must be requested. <br /> Access to septic components must be maintained. Note the location of the septic system <br /> and restrict equipment/vehicle traffic over non-load bearing (H-10) components. <br /> ➢ BUILDING: ZBA application filed, date pending. <br /> Motion made by Mr. Cook for a continuance to August 22"d, 2024, at 6:42 pm. Motion <br /> seconded by Ms. Zollo.No further discussion. <br /> o ROLL CALL: Ms. Zollo (Yes), Mr. Cook(Yes), Ms. Godfrey (Yes), Ms. <br /> Thornbrugh (Yes), Mr. Colombo (Yes). <br /> The motion passes unanimously. <br /> Documents provided: Cape & Islands Engineering, Inc; Notice of Intent application and <br /> project narrative; July 23"d 2024 "Site Plan" <br /> 10 <br />