Laserfiche WebLink
to Building Dept. Rodent inspection by BOH required prior to demolition, with <br /> abatement, if necessary. <br /> ➢ WASTEWATER: Pending connection to the Mashpee Sanitary Sewer Collection <br /> System. This property is located in the Mashpee planned Phase 2 sewer extension. Once <br /> the sewer main has been installed, the property owner will receive a Notice to Connect at <br /> which point they will have 90 days to complete the sewer connection. <br /> ➢ BUILDING: ZBA application filed, date pending. <br /> Motion made by Mr. Cook for a continuance to September 12th, 2024 at 6:36pm. Motion <br /> seconded by Ms. Zollo. Further discussion ensued. <br /> o ROLL CALL: Ms. Zollo (Yes), Mr. Cook(Yes), Ms. Godfrey (Yes), Ms. <br /> Thornbrugh (Yes), Mr. Colombo (Yes). <br /> The motion passes unanimously. <br /> Documents provided: Meyer & Sons, Inc; Notice of Intent and project narrative July 24' <br /> 2024 "Proposed Re-Vegetation Plan' July 20 2024 "Proposed Site Plan" <br /> 6:4 <br /> EXT <br /> 43 Little Neck Lane, Leonardo J. Caruso and Maria Elisa Caruso, Trustees, The 43 <br /> Little Neck Lane Nominee Trust. Request to Extend Order of Condition 043-3134. <br /> Representative: Cape &Islands Engineering,Inc. <br /> The applicant requests an extension due to ongoing medical issues which has caused the <br /> project to take longer than anticipated. <br /> Motion made by Mr. Cook to approve the extension for 3 years. Motion seconded by Ms. Zollo. <br /> No further discussion. <br /> o ROLL CALL: Ms. Zollo (Yes), Mr. Cook(Yes), Ms. Godfrey (Yes), Ms. <br /> Thornbrugh (Yes), Mr. Colombo (Yes). <br /> The motion passes unanimously. <br /> Documents provided: Cape & Islands Engineering,Inc; Request for Extend Order of <br /> Conditions 43-3134; Recorded Order of Conditions <br /> ADJOURNMENT <br /> 15 <br />