My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/19/2021 CAPITAL IMPROVEMENT PROGRAM Minutes (4)
>
01/19/2021 CAPITAL IMPROVEMENT PROGRAM Minutes (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2024 12:22:28 PM
Creation date
11/18/2024 12:22:25 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CAPITAL IMPROVEMENT PROGRAM
Meeting Document Type
Minutes
Meeting Date
01/19/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> FEBRUARY 23, 2022 <br /> Mr. Morris said he reached out to Chris Weller, Engineer of Weller & <br />Associates. Mr. <br /> Morris emailed him on May 27, 2021 requesting a letter explaining the 3 ft. <br />contradiction <br /> in the letters dated 8/29/19, and 5/15/2021. Mr. Morris never received an <br />answer or a letter <br /> response. <br /> Mr. Blaisdell asked if the letters that were sent and stamped by the <br />Engineer was giving <br /> the wrong information. Attorney Kirrane said; yes that is correct. <br /> Attorney Kirrane said he hired an engineer to measure the building, and it <br />was 1.8 ft. He <br /> commented that the building height change occurred during construction <br />of the building. <br /> He doesn't know if the design of the building was changed from the <br />original plans. He said <br /> that if an error was determined at the time of construction, a stop work <br />order could have <br /> been issued at that time. <br /> Mr. Furbush asked what the process is for inspections to be performed, <br />and if it is up to the <br /> builder to make sure those inspections are performed correctly. <br /> There was discussion regarding the inspections done on the site. Mr. <br />Bonvie said that in <br /> his opinion there was an error made by the engineer. There was no more <br />discussion from <br /> the Board or audience. <br /> Mr. Bonvie said that he will make a motion in the affirmative, and the <br />Board can decide <br /> how to vote. <br /> Mr. Bonvie motioned that the Board issue a Variance in the amount of 1.8 <br />ft. to Stewart <br /> M.Dobson and Barbara A. Dobson under §174-31 of the Zoning Bylaws to <br />vary the height <br /> of a single family residence on property located in an R-3 Zoning District, <br />Map 125 Parcel <br /> 140, Mashpee, MA. <br /> Mr. Gould seconded. Mr. Gould voted no, Mr. Blaisdell, no, Mr. Pittsley, <br />no, Mr. Bonvie, <br /> no, and Mr. Furbush, no. The Board voted unanimously to deny the <br />Variance request. <br />OTHER BUSINESS <br /> 29/41 Echo Rd: M3 Ventures, Inc.d/b/a Triple M request a Modification to <br />(SP-2015-33, <br /> 2019-36, and 2020-28). The proposed building footprint will be reduced <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.