Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br /> DECISION FOR A WRITTEN FINDING <br /> Owners, Stephen Mannarino and Tina C. Mannarino <br /> 112 Waterline Drive South, Map 125, Parcel 245 <br /> Mashpee, MA 02649 <br /> FINDING-2024-19 <br /> 3. The proposed additions, based upon the plans submitted to the Board, will be consistent <br /> with applicable State and Town statues,regulations,bylaws and plans, complies with the <br /> dimensional requirements applicable to the lot under current provisions of§174-31 (Land <br /> Space Requirements Table Footnotes)418 of the Popponesset Overly District, or for lots <br /> which have been developed pursuant to §174-21, complies with such requirements as <br /> were applicable to initial construction of the dwelling under provisions of §174-21 <br /> Nonconforming lots. <br /> 4. Construction of the dwelling is contingent upon Board of Health final approval. <br /> 5. Construction of the dwelling will conform to current building code requirements. <br /> 6. There is adequate land area to provide sufficient parking and setbacks as may be required. <br /> SPECIFIC FINDINGS <br /> The Board determined the Petitioner met the criteria for a Written Finding. Upon motion duly <br /> made and seconded at the Public Hearings on Wednesday, May 22, 2024 the Zoning Board of <br /> Appeals voted unanimously to issue a Written Finding to Owners, Stephen and Tina Mannarino <br /> under §174-17 of the Zoning Bylaws to allow for construction of a second floor addition to a pre- <br /> existing,non-conforming single-family dwelling on property located in an R-3 Zoning District and <br /> Little Neck Bay Cluster Sub-division, Map 125, Parcel 145, Mashpee, MA with the following <br /> conditions: <br /> 1. The Board has determined that the applicant meets all the conditions of a Written Finding <br /> under Mass General Law 40A Section 6. <br /> 2. Site Plan—Proposed Septic System/Site Plan, 112 Waterline Drive South, Mashpee, MA. <br /> Prepared for: Stephan Mannarino, Scale: 1" = 20', Date: 10/11/23, Plan Revision: 4/5/24, <br /> 1/29/24,and 10/27/23.Prepared by: Engineering Works,Inc. Stamped and signed by:Peter <br /> McEntee, Civil Engineer No: 35109. Date: 4/5/24. <br /> 3. Building Plans—Prepared for Steve Mannarino,Date: 11/2/2022, Scale: '/4"= 1', Job No.: <br /> 23D2-01, Checked by: PJB, Prepared by: Asher Architectural Services. EX-1: Proposed <br /> Elevations,A-1H: Proposed Elevations,A-2H: Foundation Plan,A-3H: First Floor Plan& <br /> Schedules. A-4H: Second Floor Plan/Roof Plan, A-5H: Building Sections, F-1H: First <br /> Floor Framing Plan, F-2H: Second Floor Framing Plan. <br /> 4. Conditioned on all Town Department comments read into the record including but not <br /> limited to the Conservation Department and the Board of Health. <br /> 4 <br />