My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/12/2024 ZONING BOARD OF APPEALS Minutes (2)
>
06/12/2024 ZONING BOARD OF APPEALS Minutes (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2024 5:06:23 PM
Creation date
11/18/2024 3:12:21 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
06/12/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
lease complete the table below (Lot area and structure coverage sho11-1uld be shown below in square feet): <br /> ...._ d .... � . _-MMM._ - __.._ 1 ........._ ... <br /> Crrterra �xast�n -- <br /> (if a lacale Tiro posed <br /> Lot Area u_ ��. ...... .... ...... �.._ _., . r <br /> (_..gland) <br /> Lot Area (wetlands <br /> �... ,.. ..�..,_..... .��u '��.� �-.... �.._._. -,. <br /> .. p <br /> Structure Covera e <br /> Lot Coverage** <br /> 13uildin Height � �_..m w.w._ � " <br /> Side Yard Setbacl��*.$),...... <br /> .._,_ww....m.._....._w. ........._ <br /> �front Yard�Setback <br /> Dear Yard Setback <br /> For fracture st 'era <br /> ovge plelasedshow the a r _.._..,v.........___ _. _,..._.......... <br /> gg gate total of existing and proposed structures on the site in <br /> square feet including but not limited to houses, barns, sheds, garages, pools, carport, pergolas, etc. <br /> **Lot coverage shall be calculated utilizing the Structure coverage as the numerator and lot area exclusive <br /> of water and wetlands as defined in MGL Ch. 131 Sec 40 as the denominator. Land Subject to Coastal <br /> Storm Flowage is a wetland for the purposes of calculating lot coverage. <br /> Lot Coverage= Structure Coverage/Lot Area <br /> Accompanying ie ti Narrative: The application and plans must be accompanied by a written <br /> narrative prepared and stamped by a qualified registered design professional that describes the site's existing <br /> conditions. Further, the letter should include a description of the alterations proposed in the application and <br /> identify how the proposed continuance, extension, and/or alteration of any pre-existing nonconformities <br /> will not be substantially more detrimental to the neighborhood than existed previously. The narrative should <br /> describe the storm water management and drainage provided on the site and how it comports with the <br /> requirements of the Mashpee Zoning bylaws. Further, the narrative should attest to the accuracy of the <br /> information provided in the application including on the submitted plans, application form, and within the <br /> accompanying narrative. <br /> Signature of Owner or ,A, ' orized 1 "presenta ve ach written authorization signed by property owner <br /> � p p Y <br /> if applicable): <br /> Karl certified copy of Decisior to i " a if <br /> — . _ . — . — • — • — . — — — • — • — • — • — • — • — • — • - <br /> Scheduled Date `` � �g � � ° � <br /> TOWN CLERK <br /> DATE STAMP <br /> Retie.02102,12024 <br /> P"iW? 114 '214 i,,oi i 1 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.