My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/27/2025 SELECT BOARD Minutes (2)
>
01/27/2025 SELECT BOARD Minutes (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2025 5:01:17 PM
Creation date
2/11/2025 10:20:49 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SELECT BOARD
Meeting Document Type
Minutes
Meeting Date
01/27/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3 <br /> Select Board <br /> Minutes <br /> Jarfujary, 27, 2025 <br /> ..,—-—--—----- ...... <br /> APPOINTMENTS & HEARINGS <br /> Pnlahc Private to Public Road Conversion of Btue Castle I.)rive: <br /> .. ........ - .... ... ......... . . -......... ... <br /> The Select Board opened the Public Hearing to address an update to the estimate fi)r the private to public <br /> road conversion of Blue Castle Drive, Mashpee as shown on plans entitled"'Road Takitig Plan Blue Castle <br /> Drive"dated November 16, 2024, an.d prepared by Cape &Islands Engiiaeering. <br /> In accordance with posting requirements, the Public Hearing f.,-i.otice was read aloud into tile record. <br /> Catlierine L.aurent, Director of Public Works was .in ant en,-.idance to it vie the cierical oversight with the <br /> Select Board and interested public. <br /> It was disclosed that an. error was identified in the calculation. of-the betterment cost which was initially <br /> based on (26)property owners. The cost distribution stmt,fld be calculation stiould be based on (24) <br /> property owners. The estimated bettermerlt cost for twerity.....four(24)prol,:)erty owners is$11,1 56,46 <br /> There is no change to the plan, thus the constructiori estimate remains michwi�.:,ed. <br /> Tatyana Lisichenok-., 39 ',Blue Castle Drive asked iftlie residents Nvould be required to pay .fior additional <br /> roadwork when the sewer is intalled. In response it was stated the sewer project would assume costs <br /> associated to the reSULT-fiacing oftheroad., With the road realigm-nent, there is concern regarding the removal <br /> of existing shnibbery an.d w-alls. It wai; noted the road is being stfifted at the end ofthe road, 'Fire layroU.t is <br /> 40' with, an easernent outside of the lay()Lrt previously addressed with the subdivision. Ms. Laurent <br /> indicated in genera[ site conditions are reviewed, and w1lere possible existing walls, and.vegetation etc. <br /> would be avoided within the 40' layout in the road recon.version.process. <br /> Terry Ronhock, 1,04 Degnus Road slated that rnwmy hom.cowner's atone erid ofthe road aw not interested <br /> in paving while others do no want the dirt road as they cannot access mail delivery, etc. 'rhere is concen.-i <br /> with respect to fire protection and access to the a(.I,Jacetit 'rown land. is. Ronlrock asked if there was an <br /> avenue, where, the horneowners, could petition.the Town filr fi.inds. T11re Director of Public Works responded <br /> by stating this is not a typical process, and it would require a changeil-I Policy. In the private to public road <br /> conversioin process, the horneowner incurs the cost which is assessed by betterment. <br /> l: eing no further comment, the Select Board 11.-.notioned as follows; <br /> Motion made lby Selectman Cotton to close the Public Hearing. <br /> Motion seconded by Selectman OHara. <br /> VOT E: 5-0. Unanimous. <br /> iinnllOall Vote. <br /> Selectman Sherman,yes Selectman Weeden,yes <br /> Selectman Wyman-Colombo, yes <br /> Selectman Cotton, yes Selectman O'Hara, yes Opposed, none <br />
The URL can be used to link to this page
Your browser does not support the video tag.