Laserfiche WebLink
<br />Motion made, seconded and unanimously carried to continue to May 9, 2013 at 6:09pm <br /> <br />6:06 Madeline Wong (4 Keel Way) Install a new septic system and associated piping. Existing system <br />will be pumped, filled with clean sand and abandoned - RDA <br /> Resource Area: LSCSF <br /> Material submitted: Proposed Septic System Upgrade 4/12/13 Engineering Works <br />\[10:33\] Pete McEntee is representing the homeowner and explains that she has a failed septic system. <br />The separation to ground water is insufficient so a new leaching area is required; and the tank is over 30 <br />years old so a new tank will need to be installed. Mr. McEntee is proposing a combination septic tank <br />pump chamber to a new soil absorption system that will satisfy all requirements of Title V. The new <br />system will require removal of some trees where the soil absorption system will be placed along with the <br />removal of a large rhododendron. <br /> <br />Motion made, seconded and unanimously carried for a Negative Determination <br /> <br />6:09 Diane & Joe Appleman (91 Edgewater Road) Prune approximately four trees near dwelling and <br />place gas fire pit on existing platform - RDA <br /> Resource Area: Inland Bank Associated with Santuit Pond <br /> Material submitted: Town GIS Aerial 4/23/13 Owner <br />\[13:27\] Diane Appleman states that her lot is very dense with branches hanging over the roof causing <br />fungus to grow. There are several trees that are dead that she would like to remove. Ms. Appleman is <br />also proposing to place a fire pit on an existing platform deck. Agent McManus states that on a site visit <br />to this property he had noticed several trees that were heavily damaged by (turpentine) beetles and <br />recommended that they be removed. <br /> <br />Motion made, seconded and unanimously carried to amend the permit request to allow the <br />removal of the damaged trees and issue a Negative Determination <br /> <br /> <br />3) WBNERR Telemetry Tower (Admin approval): <br />Jim Rassman from WBNERR explains that they were approached by a group called ESS that are <br />being paid by US Fish & Wildlife and the Division of Fish & Game to look at the possibility of using <br />active tags to track piping plovers and roseate terns. The group is looking to install temporary antenna <br />placements along the coast to track the birds as they come across the water. They are currently using <br />surrogate species that are not endangered. ESS has contacted Monomoy National Wildlife to install <br />one antenna at one of the towers associated with Cape Wind and also South Cape Beach / Waquoit <br />Bay. Mr. Rassman states that ESS would place a tower on the back of the changing station at the <br />State beach. The tower is 11” x 9” and 30’ tall with a 24” spike that is driven into the sand with a radio <br />pack attached. The radio does not broadcast any signals; it picks up the tag signal from the bird as it <br />comes across the wavelength. Mr. Rassman states the tower will be placed in June and removed in <br />October. The research will hopefully show ESS how many if any birds it was able to pick up and if the <br />technology has promise. <br /> <br />Motion made, seconded and unanimously carried to approve the research project as proposed <br /> <br />4) MA Division of Marine Fisheries: Santuit River vegetation clearance <br />Agent McManus explains that Brad Chase is a Marine Biologist with the Division of Marine Fisheries <br />who had come down for a site visit to the three herring runs in town. Mr. Chase’s overall assessment is <br />that they are in good shape. Mr. Chase had noticed that at Santuit, approximately 150’ downstream <br />from the fish ladder; there is a growing encroachment of aquatic vegetation which has narrowed the <br />channel of the river significantly and creates a slight impediment to slowing the herring passage. The <br />agent states that Mr. Chase asked that this issue be brought to the Commission to get authorization for <br />them to do some clearing to widen the river. The agent says that Mr. Chase’s group will wait until after <br />the season to do the clearing. <br /> 2 <br /> <br />