My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/28/1995 ECONOMIC DEV AND INDUSTRIAL COMMITTEE Minutes
>
02/28/1995 ECONOMIC DEV AND INDUSTRIAL COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2025 5:01:08 PM
Creation date
2/27/2025 11:50:07 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ECONOMIC DEV AND INDUSTRIAL COMMITTEE
Meeting Document Type
Minutes
Meeting Date
02/28/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
reviewing the matter with the Chairperson. Ted suggested <br /> checking the location of this meeting and contacting Cathy <br /> McCabe; Wayne will follow this up. <br /> Paul announced that the ETA issue was on the cover of the <br /> Business Journal, and that Barnstable has designated its <br /> Industrial Park as an EOA. They are making an effort to bring <br /> business into Barnstable and using this as a PR tool . <br /> Paul stated that he will be sending along the updated Work Force <br /> Assessment Questionnaire, and he asked each member to fill in <br /> the skills area portion. <br /> Discussion of the Work Force Database was tabled until such <br /> time there is enough information. <br /> SUB COMMITTEE REPORTS <br /> Ted reviewed the EDC Coordinator ' s FY95 projects , and a handout <br /> outlined the Mashpee' s Economic Development Work Program grouping <br /> tasks as follows: <br /> 1. 0 Marketing/Outreach <br /> 2. 0 Database <br /> 3 . 0 Work Force Assessment Survey/Database <br /> 4 . 0 Grant Support/Procurement <br /> 5. 0 Program Management <br /> Wayne asked Committee members to quantify their time spent in <br /> Economic Activities as an informational tool at Town Meeting. <br /> Steve stressed that EDC should be more project oriented rather <br /> than meeting oriented. Paul stated that this Work Program is <br /> a good planning tool. Wayne noted that the program is on a <br /> calendar basis (not fiscal year) , and this will be a good tool <br /> for PR purposes. The total amount spent to date for the <br /> Coordinator is $2 , 525 . 67. <br /> Steve gave an update report on the Guidebook distribution. <br /> He has distributed 26 copies and met with 14 real estate offices. <br /> He also met with .Chris Burden. Steve has followed up on getting <br /> the Nynex dedicated line for the Internet connection. The cost <br /> for a dedicated line is $46 per month with unlimited local <br /> access , and the jack can be installed for around $75 by an <br /> electrician. It was agreed that this will be a good investment <br /> in PR. <br /> The ED Coordinator' s Report was given by Wayne. He is awaiting <br /> questionnaire returns; changes have been made by Paul . To date <br /> we have given out 93 Guides . Meetings have been set with Marc <br /> Sobel of Seawatch on March 6th at 3 : 00 p.m. and with Blaze <br /> Stapleton on March 7th at 2 : 30 p.m. Wayne has met with Bill <br /> Hauck re: the sign by-law issue; the Chamber is working on this <br /> -.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.