My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/17/1994 BOARD OF HEALTH Minutes
>
11/17/1994 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2025 5:00:33 PM
Creation date
2/28/2025 2:38:15 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
11/17/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. 1 <br /> TOWN OF MASHPEE <br /> BOARD OF HEALTH <br /> November 17, 1994 <br /> Meeting called to order at 7:00 p.m. <br /> Members present: John T. Doherty and Robert F. Cram, Sr. <br /> THE TAPE IS NOT PART OF THE MEETING IT IS FOR THE PURPOSE OF <br /> TRANSCRIPTION ONLY. <br /> Mr. John T. Doherty, Acting Chairman <br /> 1.) Warrants signed. <br /> 2.) Board members postponed approving November 3, 1994 minutes until next week's <br /> meeting when Mr. Ball is in attendance. <br /> 3.) Variance requests: 58 Quaker Run Road, 6 Grassy Knoll Circle <br /> 58 QUAKER RUN ROAD - Mr. McQuaid relayed, "Town water is available." "I am <br /> satisfied with the design however, variances are not delineated on plans nor did the <br /> engineer attach a letter specifying the particular variances requested." <br /> Board members agreed to continue the requested variance relief pending revised <br /> plans delineating the exact distances between all abutting wells to the proposed on-site <br /> leaching facility. <br /> 6 GRASSY KNOLL CIRCLE - Mr. McQuaid relayed, "This is a preapproved <br /> subdivision with well and septic layouts." "There are two local variances required, 16' <br /> from the proposed on-site leaching facility to abutting well (lot 46) and 15' from the <br /> proposed on-site leaching facility to the proposed on-site well." <br /> Mr. Cram motioned to grant the variances as stated by Mr. McQuaid, Mr. Doherty <br /> seconded. <br /> 4.) EmerZencyjailure certification 14 Pine Grove Circle - Mr. Evans relayed, "I <br /> inspected the site and found the cesspool full." <br /> l <br />
The URL can be used to link to this page
Your browser does not support the video tag.