Laserfiche WebLink
i <br /> TOWN OF MASHPEE <br /> BOARD OF HEALTH <br /> February 16, 1995 <br /> Meeting called to order at 7:00 p.m. <br /> Members present: Steven R. Ball, John T. Doherty and Robert F. Cram, Sr. <br /> THE TAPE IS NOT PART OF THE MEETING IT IS FOR THE PURPOSE OF <br /> TRANSCRIPTION ONLY. <br /> Mr. Steven R. Ball, Chairman <br /> 1.) Warrants signed. <br /> 2.) Mr. Doherty motioned to accept the minutes of February 9, 1995, Mr. Cram <br /> seconded, all agreed. <br /> APPOINTMENT: Septic upgrade- 8 Wilson Grove <br /> Mr. Doherty stepped down from this matter as he found it to be a conflict of <br /> interest. <br /> Mr. S. Joseph DiMaggio and Mr. Cain, lot owner, were in attendance to request a <br /> septic upgrade. <br /> Mr. DiMaggio stated, "At the present time all Mr. Cain has is a 1000 gallon <br /> leaching pit." "The pit is in place and meets the required setbacks." "We would like to <br /> install a 1500 gallon septic tank and a d-box." "There is ample room for the septic tank <br /> and d-box." "Mr. Cain would like the Board's approval to have the installer draw the plan <br /> as the only change would be the septic tank and d-box." "It would cost Mr. Cain $700.00 <br /> to have an engineer draw up the plan." "The installation of the septic tank and d-box <br /> would put Mr. Cain in full compliance with Title V." <br /> Mr. Ball questioned Mr. DiMaggio as to whether he inspected the pit." <br /> Mr. DiMaggio responded, "Yes." "It is a precast pit." "All abutters are on town <br /> water." <br /> I <br /> I <br /> I <br /> i <br /> I <br />