P.O. Box 1543 <br /> Mashpee, Mass, 02649 <br /> Tel: 477-6767 <br /> April 19 , 1989 <br /> Joseph F. Murphy, Jr. , Clerk <br /> Transfer Station Building Committee <br /> Town of Mashpee <br /> P.O. Box 1108 <br /> Mashpee, RA 02649 <br /> Dear Joe: <br /> Your letter of April 7 , 1989, to the Water District, <br /> regarding the timing for available public water in Asher' s <br /> Path has been received and discussed by the Commissioners. <br /> Our present time schedule indicates that the water should <br /> be turned on in December. This December date depends on a <br /> number of requirements being met involving the Department of <br /> Environmental Quality Engineering and the transfer of funds <br /> from the Town to the District, which as you know, has a <br /> state legislature bill approval requirements. <br /> The pumping station will take the most time to complete. <br /> Design for this station and the pipe laying is 90% complete <br /> and can be ready to go to bid in May if the funds are avail- <br /> able to us. A pumping station takes about six months to <br /> build once the contract is awarded, so the timing of the <br /> transfer of funds from the Town plays a crtical part in this <br /> very tight time schedule. <br /> At this time, I see no reason to believe that our December <br /> schedule can not be met. I suggest you plan for April of <br /> 1990, to be safe. I will advise you during the summer if I <br /> can improve on this time schedule. <br /> Sincerely yours, <br /> Nathan S. Ellis <br /> Manager <br /> f -; Mashpee Water District <br /> PR 2 11989 u <br /> NSE:ngm <br /> x <br /> NMHP <br /> EE fICE�t►I�N'S <br />