My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/15/2025 BOARD OF HEALTH Minutes (2)
>
01/15/2025 BOARD OF HEALTH Minutes (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 2:31:09 PM
Creation date
3/12/2025 2:31:08 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
01/15/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Town of Mashpee <br /> <br /> 16 Great Neck Rd North <br /> <br /> Mashpee, MA 02649 <br /> <br /> <br /> <br /> <br />Board of Health – Public Session Minutes <br />Wednesday, January 15, 2025 <br />Waquoit Meeting Room, Mashpee Town Hall <br />Board Members Present: Absentee Members: Additional Attendees: <br />Ernest Virgilio, Chair Zackary Seabury, Health Agent <br />John Livingston, Vice Chair <br /> <br /> <br /> <br />CALL MEETING TO ORDER <br /> <br />4:30 Mr. Virgilio calls the meeting to order. <br /> <br />OLD BUSINESS <br />None <br /> <br />NEW BUSINESS <br /> <br />1. Review and approve minutes – December 18, 2025 <br /> Motion made by Mr. Livingston to accept the minutes as presented. Motion <br />seconded by Mr. Virgilio <br />i. Roll Call: Mr. Livingston (Yes), Mr. Virgilio (Yes) <br />Motion passed unanimously. <br /> <br />2. 2 Ned Besse Road – Request for Variances from Title 5 and Local Regulations <br /> Homeowner: Peter Solenius; Representative Attorney <br /> Seeking variance from an I/A requirement for septic system replacement <br /> Property within phase 2 of the sewer area <br /> Existing Title 5 system installed in 2021, passed inspection in 2020 and 2024 <br /> Withdrawal of fourth bedroom variance request <br /> Zoning approval for three-bedroom house <br /> Septic System Details <br /> 374 gallons per day system installed <br /> Only 330 gallons required for three bedrooms <br /> Sewer superintendent letter provided <br />Discussion and Agent Recommendations <br /> Agent recommends granting variance due to phase two sewer status <br /> Suggestions to include condition if sewer connection doesn’t occur as planned <br /> Timeline for sewer connection: Spring 2028 <br /> If the connection is not completed by Dec. 31, 2028, the applicant must return to <br />the board for a new variance if not connected to the sewer by the deadline. <br /> <br />1 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.