Laserfiche WebLink
OII.-S E.i S i F <br /> FURITIES (V 1011cli u0_1 1q32 <br /> The followihg members of the Con servation Commission were present: Pauline F. <br /> De or;y, Chairperson, Dorothy G. Studley, Vice Chairperson, Charles Buckingham, <br /> Wayne Tavares, Peter Durmer, Shirley Na.delma.n and March Dardano. <br /> The meeting was called to order at 7:30 P.M. A lotion was made by Pauline DeLory <br /> to accept the minutes ofebruaa:a%- 1982. Dorothy Studley seconded the motion. <br /> Approval was given by the Board for the Secretary to look into a. price on a lateral <br /> f iling cabinet. <br /> Election of Officers i <br /> F-,airf.erson D Lory asked .the other members of the Board to think about the election <br /> of now officers for the Conserv,-,tion Commiss ion, <br /> Buffalo ead - New S e bu 's oris . 11 u i D ear e l o om en t <br /> . A preliminary plan was received from the Planning Board on the above development. <br /> The secretary was asked to send a. letter to the Planning Board advising them that <br /> there is a conservation ea.semen,:. abutting the development which is now towned owned <br /> property given as a. gift from 1H',l is e Otis of 7.2 acres <br /> The secretary was also asked to send a.-memo to the Planning Board suggesting that <br /> they take the names of streets and condominiums into consideration as they are similar <br /> to roads already. named. The Commission wa.s concerned about a. f ata.i ity occuringf <br /> eaves t'Drive <br /> letter dated January 6, 1982 wcas rec eived from Dick Terry, Chairman of the planning; <br /> Board advising the Commission that the Planning Board unanimously voted to accept the <br /> New Seabury sub-division of lots around Seanest Drive, The secretary a. asked to <br /> send a memo back to the Planning Board advising them not to accept the definitive plans <br /> n Seanest Drive unless they crew.to a holding pond as no open drains or run-offs are <br /> allowed into wetlands or low areas, <br /> 2:45 P.11. Hear <br /> SE'43-223, Lot 58 Keel Way, Great E iver, Mashpee <br /> Druce Fulton was 'resent for the following hearing: <br /> Pauline; Read the public hearing notice -- to build and maintain a, treated pile and <br /> timber dock, ramp and float at Lot 58 Keel Way, Mashpee on Creat River. A Chapter 91 <br /> permit will be required by the Division of Waterways. DEI:)E is suggesting that coastal <br /> wetlands regulations 30, 32 and 34 be reviewed, which is pertaining to marsh and wet- <br /> lands. They also suggest that the dock be elevated at a minimum of one foot above' the <br /> highest siring tide. The docking should be spaced to allow sunlight to penetrate be- <br /> low and construction should proceed from completed sections of dock. <br /> Druce: Shows the 13cyrYI where Great River cu es in and explains that this lot is the <br /> -last lot on the peninsular, The scale on the drawing is 1" to 20' and there is about <br /> 20 f eet of marsh-to go over bf ore you get to the water. The tide change .is about one <br /> foot and there is approximately 2 feet of water at low tide where the end of the pier <br /> will be. It never really gets too deep in there, <br /> Charlie: Asks ,Bruce if he intends to put a float out there? <br /> Bruce: States that he hadn't plan- ed on puttine: a float in. <br />