Laserfiche WebLink
r <br /> 4 ' <br /> MASHPEE CONSERVATION COMMISSION <br /> Meeting of July 25, 1985 <br /> Present at this meeting were : Pauline DeLory, Louise Behrman, <br /> Stuart Peoples and Elliot Rosenberg, s March Dardano, Chairman <br /> Pro Tem, was absent during the first portion of themeet' , r. <br /> Rosenberg acted as Chairman S Ing <br /> Lawrence Cardar lli Carted. Development Corporation) Holmes & McGrath, <br /> Inc. - Agent <br /> This application, originally scheduled for hearing for June 20 , 1985 <br /> is to construct and maintain an 8901 x 18' roadway, catch basins <br /> and berms ; construct and maintain a 160, x 161 driveway, clear, grub, <br /> regrade , fill, loam and seed and plant below and beside the proposed <br /> road construction; place a 36" FACE and construct two r iprap inlets <br /> and outlet headwalls at Lot #6 Great Neck Road. Cartel Corporation <br /> and o sway Realty Trust) <br /> Beca se the Cartel Development Corporation was awaiting decision b <br /> the lannin.g Board., this hearing was continued to the meeting bei <br />