Laserfiche WebLink
MASHPEE CONSERVATION COMMISSION <br /> MEETING OF AUGUST 13, 1987 <br /> Commissioners Present: Elliot Rosenberg, Chairman pro tem; Carol <br /> Jacobson; Joseph Burns; Heather Urquhart; <br /> Mary Mars ters. <br /> john Varkonda was also present. F <br /> 7:30 Thomas Nutil a (Arrow Engineering Inc-Agent) To construct ..a. <br /> single family dwelling, well and retaining walk, at Lot 75 Edgewater <br /> Drive. Bob Raymond presenting* To create a level area behind the <br /> dwelling, a retaining wal.l# is proposed with 60 yards of material <br /> contained. The driveway is to be paved and the well is 152 feet <br /> from the proposed sewage system. Any disturbed areas will he "graded <br /> and stabilized with landscaping or other indigenous plants.- <br /> Mr. <br /> lams.Mr Burns stated the property was viewed twice- acid the. distance' "'from <br /> the corner is less than 96 feet. <br /> John stated he reviewed the plans. From the actual fr n a ; i:# <br /> pond it measures 83 feet up the+ slope where the hoose was staeC: <br /> The measurement . Brom the edge of the garage which was sta. a � was <br /> 56 feet. <br /> N. <br /> Mr,. Raymond stated it would seem it was staked incorrectly. Z.e <br /> will verify thy,s. He advised he looked at the property today,And.. <br /> will suggest they rotate the building and pull it further up..,, Se.:� <br /> slope, pulling the house forward, He stated he will give the <br /> Commission a revised plan and requested a continuance. <br /> Mr. Rosenberg questioned the paved driveway and asked if Mr. rutile <br /> would live i tax a gravel drive. Mr. Nutil a stated if the mount of <br /> paving is a problenr,, it could be altered. <br /> Mrs . Marsters suggested a -dr, whIch Mr,, Raymond stated would be too <br /> close to the septic. <br /> With the curve and -apron -to the garage a considerable area of pang., <br /> Mr. Rosenberg suggested making the turnaround gravel and the apron <br /> into the garage a hard surface. <br /> John questioned whether the bu die ng inspector should review the plans. <br /> Mr. Raymond stated the stakes will be corrected for the house in the <br /> new location and the Conservation officer will be notified. <br /> HEARING CONTINUED PENDING FURTHER PLANS. IF THERE ARE No FURTHF <br /> QUESTIONS, HEARING WILL BE CLOSES <br /> 7: 45 - Sntuit Woods Limited Partnership (All Cape Survey Consultant) <br /> To construct an asphalt roadway at Nobka Road between Lots 1 <br /> Tina Baylog presenting with Bill Bliss of Mirr one Construction corp. <br /> Staked haybales are in place, The leaching basin from the lt o <br /> work is 29 feet and it is 44 feet from the area of work to the wetland. <br />