My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/8/1988 CONSERVATION COMMISSION Minutes
>
9/8/1988 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2018 5:01:30 PM
Creation date
2/21/2018 12:38:38 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
09/08/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
M <br /> MAS CN:E;E:F;ZV -rN COMMISSION <br /> Commissioners Present: Elliot Rosenberg,enberg, hair na Pro Tex; Carol <br /> . ac hson; Joseph Burns; Patrick Coffey ; Mary Marsters. <br /> The meeting was called to order at ' = - .m. <br /> Bob [3-.jrSmann Of f101meS & McGrathstated at the last me et i re , we were <br /> looking at a Certificate of Compliance for the road construction at <br /> Bc w y Bay Road and Ue s {i.5n- +ata ra i o:� w - i the ha:l al l s-. placed v - .t <br /> the end of the drainage pipe off the end o the roadway ' e'' i i'nal <br /> Orden o f Cond i ti ons issue d had requested a separate f i I i g be Made for � <br /> the headwall even though the ea all & a s were shown o the plans <br /> submitted at the time the road. construction was approved by theComm- <br /> ission. The contractor, making no e u �� � him, -went ahead and did <br /> the headwalls without making a filing. The headwalls were constructed <br /> differently than shown on plans prepared by his office. As-built <br /> drawings were f'i est with a request -to amend the Order.. and issue a <br /> Certificate o - Compliance with -the headwalls In the configuration that <br /> they now exist. 'odd Pal atier informed Frim the commission wanted more <br /> detail as to how the headwalls case to be in the .c' nfi.,S -r a t-ion.,. ;;.'. <br /> Y <br /> are in now. -e talked too the owner of the property t. :et e r e_:, - a.'_ <br /> back round and is here to offer the explanation o t the fact that--'-.--.the: <br /> design for the headwall wa5 dictated to the- con-tractor constr -tI,- & .4 <br /> e roadway by, Charles Rowley in h is capacity- as errgeer =-� : <br /> planning board. He had felt, rightly or wrongly, that t-h d ai1�-'t* at, <br /> e had on the plan we prepared for the headwall. was not a- tie-,'.an . <br /> e ordered the contractor to construct the headwall in a t# ick r con- <br /> f ig rion so the headwall is a broader depth of concrete. at. the:.,erred- <br /> of the pipe than shown on their detailed plan. The reason t ': sin <br /> was chapged was at the ,instruction of Ctar,"Les Rowley acting in i- <br /> ca ac of consultant to the Planning Board. <br /> Mfr . Rosenberg noted from the last meeting a request from Mrs, Marsters <br /> that there be a let-ter from the engineer describing the dif eren . <br /> Mr. stated that was not communicated t.o him. <br /> Mr. os nr•g sugsested a letter be pro filer# stating h reasoner .1-d <br /> # scribing the changes made at the recommendation of the Town Engineer <br /> and have him endorse the letter to complete the file. The Commission <br /> agreed as well as Mr. Burgmann. He advised the revised as built. eras.-_- n <br /> the files. <br /> This is to be moved on at the next aeeti g. <br /> -- org .. IL th l � - a proposed ,_ <br /> head along the shore of a-ml in' s Pond at Lots 9 & 10 MonomoscoyRoad <br /> West. Mrs . Marsters stood down- for this hearing. Abutter rec-ei ts- <br /> sa p 'es*ent d* Dave Sarich i presenting. '11heip a're. ro. ��*iu h - t <br /> � � t re �• �:.�� ����;� ���r� .ir���e a�'� c:�;�. tin ; � � I .1 o"d telephone pales are <br /> s zjn on the plan with dotted line which have been maintained for <br /> some time but are deteriorating and erosion is coming from the- back- <br /> side. <br /> a - <br /> sid . He showed a land c urt plan or 1967 showing -the shoreline. <br /> They are not asking tog o b,3 o g a t. i, s 'shown ort the ' lay only <br /> trying to maintain the shore line. It is in Flood Zone. A14, elevation. <br /> .12 which is 81 over the top of this bulkhead which is not constructed <br /> for any purposes with reference to a flood situation, the water is <br /> going to come over it. At tete Board o w��;��.�� s, the Shellfish Warden <br /> voiced positi e approval f the plan . e awse the shore is a sand sit- <br /> u at i on , i i s covering the s e.l f i t�� ����.�� ; � s i l WaI tain the <br />
The URL can be used to link to this page
Your browser does not support the video tag.