My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/6/1989 CONSERVATION COMMISSION Minutes
>
4/6/1989 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2018 5:07:48 PM
Creation date
2/21/2018 1:25:43 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
04/06/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 ., H MSbVA7 N COMM !S!S I ON <br /> teetg f Ap ` -I 6 . JL989 <br /> Commissioners Present: Gertrude Simmons, Patrick Coffey, Joseph Burns, <br /> Elliot Rosenberg& Associate member Elizabeth Terry. was present also. <br /> Prior to the commencement of the hearings, Bob Burgmann of Holmes <br /> McGrath and -Peter Va derbi l -spoke with the Commission regarding. Carte, <br /> . Development. - -Mr. Cadare 1 l has set up the paper- work with the Town <br /> Treasurer and- as soon as -the Certificate of Compliance is voted,--the <br /> 1 000. will be put in the account.-,There are . two orders, one on .-the ; <br /> road S -428 and one on- the headwall S - -542. <br /> Mr. Coffey asked where the lots are recorded and was told they are <br /> registered land. -' -- <br /> -.When advised. f' ,the Corm s on`s-,:rote the check can .-be delivered and <br /> the.� erti ficat aai'led', <br /> ::_ : Ston .. ernduoci -Sand Dollar Lane, - continued . from <br /> ,Susan Asmus presented. landscape plans with homes on . the ..adjoining -lots <br /> ,.located. :,. .Concerns for possible gullies between the homes -.due to the <br /> -topo, has been considered. -arid -flattening of -the lov .is proposed- with - <br /> ..steps and. stairs to serve as terrace areas.--to slow runoff..-. <br /> There will . be more e cut and approximately 200 sq. yds. of extra fill <br /> wi.11 be trucked away from the site. <br /> Mr. = Burrs questioned,- he-.-ter-rac%ng and the. drop on . each s eetion.:.:- <br /> Mr. -Rosenberg -asked how. high their.6 were bringing the house; was. she <br /> saying they. are.--.3 - f t._._... below the 1-1 .1t. , Line In one .area,Tand 5...ft& <br /> bel-ow over .hre...,i-_there .does the 11 - ft line go <br /> - s ,Amus stated shecould not answer that.,- . It. is a difficult topo <br /> because of the retaining gyral 1..' .Elevation bf the first- floor o- :the <br /> -hove, :not the . basement.. is 21.5. . <br /> Mr-.-Rosenberg asked i f- the basement would be .11. -.,- ft.. high 9.. -.:.Th <br /> Comm-ission. wanted to know what Is going to happen between the two <br /> panels, if,..they are going to build up to 21 ft. - and, have- a drop off <br /> to ,40 Assus stated that's the- reason. for the proposed rew <br /> - grading all the way down the side' . 6 Mr. Rosenberg asked to what height <br /> She stated it will- be the same -height on the property line, they are <br /> flattening -out the .iot+ - <br /> ,.Mr ,.-.Rosenberg asked khat -the 10 ft. is in here? IMs, Asmus stated- It- is <br /> obviously a mistake. - Mr. Rosenberg asked -if the 8 ft. is also a <br /> mistake? She stated she would imagine so*-. -,-They will -cut into the ,. . <br /> -hill. for the foundation and bring the -fill over -here..-.,-':It will be <br /> - walkout. <br /> Mr. Rosenberg asked why 30 ft# was needed between the haybales and the <br /> deck? <br /> Ms Assus stated for the regrading to stop more runoff* Over 200. cu. <br /> yds* of fill are to be removed based on the plan. -Mr. Rosenberg <br /> stated he saw it having to come in rather than be removed, Ms Asmus <br /> stated there is obviously a problem with the plane <br />
The URL can be used to link to this page
Your browser does not support the video tag.