Laserfiche WebLink
r. <br /> a <br /> AD-HOC COMMITTEE ON PLUMES IMPACTING MA HPE <br /> MINUTES DECEMBER, 4, 1997 <br /> Greg Taylor, Chairman, called the ateet ing to order at 8 : 30 a.m <br /> j.n conference. ROOM #2 at Mashdee Town Hall. <br /> Present: Bob Whritenour, Elliot Rosenberg, David Rich, Nancy <br /> ca f f n, Bob cr aia. <br /> The Minutes of October 17 , 1997 and November 6 , 1997 were <br /> ad roved as amended. <br /> Nancy C. displayed ars updated DEP iiiap showini4 the movertlent <br /> of the dlurkies . <br /> Gr eLj T. distributed cod ie s of the MMR Proposed Plan to clean <br /> uthe six areas of contaiaination., Grey T. stated that basically <br /> they d1an to contain and remediate the plumes. The rewediation <br /> x.11 occur at the ground level source areas where they started. <br /> A discussion occurred about source vs . plume .areas . Greg' TO <br /> stated that the law suddorts source area , and der ittinq <br /> structure is set up by statute. <br /> Bob W. asked if some are on Torn conservation land. Grecs. T. <br /> did not ]snow. Elliot R. stated that it is less likely. The <br /> iia .iedosit .oni' s to identify the sourceIP <br /> Greg T, was disappointed in the report since there was no <br /> discussion about chemical compounds and their concentrations <br /> and the results frow testing. <br /> Bob C, noted that the SD-5 redort Mashpee paid for was excellent. <br /> He feels this should code from the wilitart' <br /> Elliot R. stated they are goingi to do treatment on site. What <br /> about removing? <br /> Greg T. stated they are going to "inca,?sulate" . The material <br /> will get recycled in ashpha1t. They plan to dilute and Latch. <br /> They will remove the material and use it for paving on base <br /> The public coILI�ttent period has been extended to January 16 , 199816 <br /> Gre1 T. ' s comments to there were that there is not enouLjh "I-tqea.t" <br /> to this Plan to make a decision. The risk assignment was done <br /> and it overly conservative. <br /> Nancy C. recommended lobkin4 at storm drainage on #4 and <br />