I:
<br /> T 0 le-111 10-F M H E E
<br /> TO VAtz-,-4 L Ef,
<br /> MASHPEE CONSERVATION COMMISS9319EP 23 A141 12" 06
<br /> AGENDA
<br /> 6 OCTOBER 2005
<br /> 6:56 PUBLIC COMMENT
<br /> :00 Gerry Graves, 318 & 322 F edl rook Fid., continued from 918!05 NOI.
<br /> 7:05 .Jemm Real Estate Partnership, 55 Sunset Circlet continued from 918105 N01
<br /> 7:10 ., John Harris, 97 games Circle, continued from 918105 N I
<br /> 7:15 Mane Devlin, 79 Sunset Circle, (rebuild deck, change in exit.stairs, and build deck with walk- RDA
<br /> out level, replace retaining wall)
<br /> 7:20 Geoffrey Willis, 55 Hooppole Rd. (vista pruning with maintenance in perpetuity) NOI
<br /> 7.25 Ethel McSweeney, 107,wines Circle, (shed, new house, garage, deck, galls driveway, pail], MOI
<br /> septic., utility, grading and plantings)
<br /> 7;30 save Popponesset Bary, Popponeset Creek and Spit(maintenance dredging of AOC
<br /> Popponesset Creek with each/dune nourishment of the Popponesset Spit)
<br /> 7:35 John Hayden, 26 Crosstree Way, (extending deck with sonotubes, and constructing wall) ICDA
<br /> 7:40 Robert ert Romain, 36 Barbary Circle, (prune limbs, remove dead trees and plant shrubs) RDA
<br /> 7:45 Bruce & LuAnn croft, 19 Waterline Dhve, continued from 9/22105 ICDA
<br /> 7:50 Heather Put , 53 Toisset St., continued from 9122105 RDA r
<br /> 7:55 William Zarner, 4 Squaw's Lane, (demo, reconstruct house, driveway, utilities, septic,, NOI
<br /> plantings, and lawn)
<br /> .Michael LeBlanc, 141 Daniel's Island Road, (temporary access, silt fere to hay bales, AOC
<br /> rebuild wall)
<br /> 8:05 Nancy Gifford, 33 Sturgis Lane, (rebuild and a ist.ing retaining wall and landscaping) RDA
<br /> 8:10 Carl Oliver, 25 Riverside Rd. (replace two pilings) FDA
<br /> 8:15 POST HEARING AGENDAr
<br />
|