My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994 JAN-JUN-HIGH SCHOOL BUILDING COMMITTEE
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL COMMITTEE
>
HIGH SCHOOL BUILDING
>
1990-1999
>
1994
>
1994 JAN-JUN-HIGH SCHOOL BUILDING COMMITTEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 7:15:16 PM
Creation date
11/17/2016 3:30:51 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
06/30/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MASHPEE HIGH SCHOOL BUILDING COMMITTEE MINUTES <br /> ' TUESDAY, FEBRUARY 15 , 1994 <br /> TOWN HALL <br /> Present: Peter Dinizio, Janice Mills , Merry Sue Ahlgren , Bill Jones, Bill <br /> Martiros, Joe Polito, Steve Greelish , Paul Griffin, Michael Pare, Joan <br /> Avant Tavares, Greg Taylor <br /> Absent: Jayne Hendricks <br /> Meeting convened at 7 :02 p.m. <br /> MINUTES <br /> ** Ms. Ahlgren made a motion to accept the minutes of Jan. 18, Jan. 25 <br /> and Feb. 1 . Paul Griffin seconded the motion. All members were in <br /> favor. ** <br /> COMMITTEE DISCUSSION RE: ARCHITECTURAL FIRMS <br /> Mr. Dinizio suggested the Committee talk about each firm, in chronological <br /> order (according to date interviewed) . Each member can say how they felt <br /> about each of the firms. The Committee agreed. <br /> KEYES <br /> Bill Jones thinks they are a complete firm, have a good track record , build <br /> efficient buildings. They are one of his top choices . <br /> Merry Sue agreed they are one of her top choices. They have Cape <br /> experience and worked with Cape architecture. <br /> Janice Mills also agreed they are one of her top choices. There basic <br /> design is very efficient. <br /> Paul Griffin agreed Keyes is a very good firm. If they were chosen, we <br /> j can talk about our concerns about lack of "flair" . He liked all their jobs <br /> he visited. He is concerned the Groton school had some problems which was <br /> mainly contractor responsibility but Keyes agreed they should have followed <br /> them more carefully. <br /> Peter explained some of the problems at the Groton school . The town will <br /> have to pay for those repairs. The computer system is not up to speed , it <br /> had a lot of problems. This Building Committee would have to be sure to <br /> put more "flair" into the design. Aside from the problems at Groton, the <br /> other schools were nicely done. <br /> Bill Martiros agrees with Paul , he was on the same trip. They don 't seem to <br /> be very imaginative. <br /> Joe said having all in house disciplines is a plus. The concept for <br /> Marstons Mills school worked. A lot of creativity will be required and <br /> that will have to be looked at hard. He does not know if Keyes will be <br /> able to do that. <br /> Steve is impressed with their broad base of architectural work. He did some <br /> background on the Groton school , it was clearly the contractors problem and <br /> the school committee or clerk of the works let them get away with it. He is <br /> familiar with that contractor . He saw innovative use of materials at the <br /> Marstons Mills school . <br /> Michael Pare took an analytical approach . He first went through the State <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.