My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994 JUL-DEC-HIGH SCHOOL BUILDING COMMITTEE
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL COMMITTEE
>
HIGH SCHOOL BUILDING
>
1990-1999
>
1994
>
1994 JUL-DEC-HIGH SCHOOL BUILDING COMMITTEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 7:15:21 PM
Creation date
11/17/2016 3:30:54 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
12/31/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Issue for the team to address at the value management workshop? <br /> Dr . DeMoura said he reviewed the specs and had comments . He asked that the <br /> Committee consider not using insulated glass , it has been a huge <br /> maintenance problem in the Middle and Coombs schools . He suggested the <br /> storm panels used in the addition . <br /> He asked there be no flat roofs. <br /> Everyone discussed the insulated glass . It is a good value if specified <br /> properly . There is an energy code to be met and insulated glass will <br /> probably have to be used to meet it . Today ' s technology is different and <br /> they have not experience any problems with this technology. <br /> Dr. DeMoura responded the Coombs school opened in 1989 and the installers <br /> are still replacing glass . <br /> INTERSECTION IMPROVEMENTS <br /> Greg Taylor sent a memo to the Committee on the signalization of the <br /> intersection . The first step is a traffic study , full design of the <br /> intersection . The intersection needs to be re-aligned . You should plan now <br /> for the land needed for improvements while designing the entrance . The <br /> installation of the signal will cost between $50 , 000-$125 , 000 . Total cost <br /> will be $150 , 000-$300 , 000 . <br /> Paul said the budget does not include money for off site work . He thought <br /> the improvements were something that was on the boards in the future . <br /> Greg said it is not. <br /> Paul asked if it could be a separate warrant item to the town? <br /> It could. <br /> Bill said when the PAC goes in , they will use the intersection as much as <br /> the school . Will they share in the cost? Can that be made subject to <br /> getting their permits? <br /> Steve said you cannot charge them after the fact . <br /> Paul suggested submitting a letter to Bob Whritenour asking how to go about <br /> it, it is out of this Committee ' s scope. <br /> Merry Sue noted in the comparison between the two sites there was a line <br /> item for the signal , but the cost was not this high . <br /> Peter asked if the school could be built without the light, who requires <br /> it? Greg Taylor said the Committee. <br /> Greg said the $6 ,000 traffic study and $30 , 000 design fee should be funded <br /> so this can move ahead and then you can get a better idea of the final <br /> costs of the site improvements and signal . <br /> The plans all have to be reviewed by the State , it takes time. He would <br /> like to see it designed over the winter . <br /> Peter asked if it is the opinion of the Committee the intersection has to <br /> be improved? <br /> The Committee agreed it does have to be improved . <br /> Paul said he would like to research this subject a little more . <br /> The Committee will talk about it further at their next meeting . <br /> Ian said any questions from the Committee on Shannon ' s schematic design <br /> review would be helpful . Bob Fournier will prepare a formal response but <br /> will continue discussing it with Shannon . <br /> Joe explained the Committee would like to see line item back up for <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.