Laserfiche WebLink
MASHPEE HIGH SCHOOL BUILDING COMMITTEE MEETING MINUTES <br /> TUESDAY, DECEMBER 13, 1994 <br /> TOWN HALL <br /> Present: Peter Dinizio, Joe Polito, Janice Mills, Bill Martiros, Merry Sue <br /> Ahlgren , Paul Griffin , Steve Greelish <br /> Also Present: Ian Aitchison, Tom Wren, Ed Frenette, Phil Poinelli , Brian <br /> Lawlor, Bill Hauck , Dr. DeMoura, Greg Taylor, Mike Pietrowski <br /> Meeting convened at 4 : 08 p.m. <br /> COMMITTEE DISCUSSION <br /> Janice explained last week she, Dr. DeMoura, Phil Poinelli , Manny Tavares <br /> and Joe Polito met to go over the plans. Those plans were not up to date <br /> and Phil and Manny Tavares juggled around the music and art rooms . Joe and <br /> Janice told them not to make that change. She said the Committee needs to <br /> demand up to date plans and study them on a weekly basis. Things are <br /> happening the Committee does not know about. <br /> Paul said not all the plans are on CAD yet so it is a problem keeping them <br /> updated. Paul went to SMMA' s office last Tuesday and Phil has found a way <br /> to eliminate a corridor on the second floor, for a cost savings. They are <br /> critiquing the plans in an effort to save costs but they do not have <br /> permission to juggle things without getting specific permission from the <br /> Committee. <br /> Janice said they were not even aware of the changes Merry Sue and Ray had <br /> worked on. <br /> Paul said the Committee can bring that to the attention of SMMA - the <br /> Committee wants any changes to come to them before they are made. <br /> Peter said at last night's meeting the Selectmen did not support finding <br /> additional space for the Superintendent so he will be in Town Hall until <br /> the High School opens and then provisions will have to be made for his <br /> space in the High School . <br /> Paul suggested getting the principal on board first and he can begin <br /> programming and find a suitable location. <br /> Committee Discussion with Mr. John Brooks of Brooks/Flemming Technology <br /> Consultants. <br /> Paul asked him to give the Committee a history of his company and what they <br /> can do for the High School . <br /> Mr. Brooks explained they are engineering consultants based in Burbank, CA. <br /> There are 8 associates each with different specialties. Their clients are <br /> architects , schools, TV networks and motion picture studios. They do <br /> communication engineering consulting - audio, video control , data and <br /> telephone systems. <br /> He sees a "melding" of technologies. Synergy system is one type of system <br /> for integration . He has just worked on a high tech restaurant (owned by <br /> Steven Speilberg) that used it to control all high tech equipment in the <br /> restaurant. <br /> They are strictly consulting engineers. They recommend approaches to take <br /> and then engineer them, they work with the architects. They do not buy or <br /> 1 <br />