My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994-HIGH SCHOOL BUILDING COMMITTEE
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL COMMITTEE
>
HIGH SCHOOL BUILDING
>
1990-1999
>
1994
>
1994-HIGH SCHOOL BUILDING COMMITTEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 11:25:51 PM
Creation date
11/17/2016 3:30:50 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
12/31/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To: Town of Mashpee <br /> Town Hall <br /> 16 Great Neck Road South <br /> Mashpee, Massachusetts 02649 �L� 0 0 <br /> Attention: Mr. Paul Griffin, Chairman, Building Committee ANDREW� C H A R T W E L L & CO. <br /> Date: November 29, 1994 <br /> Invoice No: B/1674/2870/9 <br /> NEW HIGH SCHOOL <br /> Mashpee, Massachusetts <br /> For providing basic Project Management services during the Preliminary <br /> Design Development stage, including: <br /> -Reviewing, checldng and commenting on revised design and <br /> construction schedule, <br /> - Overseeing, monitoring and reporting on the developing <br /> design process; <br /> -Preparing and checking cost studies, <br /> -Attending meetings with Building Committee, Town <br /> Officials and Design Team; <br /> -Acting as liaison between Building Committee, Town and School <br /> Officials and Design Team for information needs, arranging <br /> meetings and other requirements; <br /> -Preparing and presenting Progress Status Reports; <br /> -Preparing and presenting an Interim Report on SMMA's <br /> Design Development Estimate;and <br /> -Following up action items arising from Reports and other meetings. <br /> Total Amount Due: $12,000.00 <br /> cc: R. Wbritenour, Executive Secretary <br /> Construction Cost Consultants <br /> Program&Value Managers <br /> 153 Milk Street,61h Floor <br /> Boston,MA 02109-4809 <br /> Terms: Net 30 Days; 2% Interest per month after 30 Days TEL:617 737 9339 <br /> FAX:617 737 0540 <br />
The URL can be used to link to this page
Your browser does not support the video tag.