My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994-HIGH SCHOOL BUILDING COMMITTEE
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL COMMITTEE
>
HIGH SCHOOL BUILDING
>
1990-1999
>
1994
>
1994-HIGH SCHOOL BUILDING COMMITTEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 11:25:51 PM
Creation date
11/17/2016 3:30:50 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
12/31/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MASHPEE HIGH SCHOOL ChaQMON O ANDREW CHARTWELL & CO <br /> DESIGN TEAM: FEES MONITORING CONTROL <br /> ADDITIONAL FEES AUTHORISED AND TO BE AUTHORISED <br /> Consultant Amount Source <br /> Daedalus (Schematic Est.) 8,000.00 B. Comm. Mtg. 6.24.94 <br /> Mashpee Water (Flow test) 50.00 ACC to SMMA 08.01.94 <br /> Tavares (Kitchen) 700.00 B. Comm. Mtg. 08.16.94 <br /> Lelito Environmental (moth) 800.00 B. Comm. Mtg. 08.16.94 <br /> Public Archaeology (IAS) 11 ,762.00 B. Comm. Mtg. 08.16.94 <br /> 'Public Archaeology (Bores) 1 ,818.00 B. Comm. Mtg. 08.16.94 <br /> BSS Design (Land Acgn.) 1 ,500.00 B. Comm. Mtg. 09.20.94 <br /> BSS Design (Deed search) 2000.00 B. Comm. Mtg 11.29.94 <br /> 2BSS Design (STP Survey) 900.00 To be ratified by B. Comm. <br /> 3Woodard+Curran 20,000.00 B. Comm. Mtg. 29.11.94(prov) <br /> Lelito (Habitat Study) 1,500.00 B. Comm. Mtg. 7.2.95 <br /> 4BSS Design (C+G Survey) 6,000.00 'Reimbursables' clarification. <br /> 5VHB ('Off-Site' Improvmts.) 19,700.00 Yet to be approved <br /> 6VHB (Extra study: trafficlights) 4,700.00 Yet to be approved <br /> SUB-TOTAL 79,430.00 <br /> Add SMMA uplift @ 10% 7,943.00 <br /> TOTAL 'A' 87,373.00 <br /> LUMP SUM ADDITIONS <br /> Haley & Aldrich (Geotech.) 13,000.00 SMMA'S RPF Itr 4.5.94 <br /> BSS Design (Land survey) 16,500.00 SMMA'S RPF Itr 4.5.94 <br /> .Envir. Impact Report (EIR) 37,900.00 Selectmen Approved (Max). <br /> CCR Technology 15,340.00 B. Comm. Mtg. 9.1.95(Prov) <br /> Advance Siteworks Package 18.685.00 B. Comm. 17.1.95 <br /> TOTAL 'B' 101 .425.00 <br /> Total A+B 188,798.00 <br /> 1 Figure approved by Building Committee was up to a maximum of$2,000.00 <br /> 2 A motion for this fee has yet to be carried. <br /> 3 Fees for Woodard & Curran remain to be settled as noted in Meeting Minutes dated 29 November 1994. <br /> 4 Awaiting confirmation as to what is included in 'Reimbursables. <br /> 5 Awaiting opinion from Greg Taylor <br /> 6 Copy not yet with ACC;to be examined to see if this fee could have been part of EIR lump sum fee. <br /> 7 Awaiting breakdown from SMMA as to what is included in Base Fee. <br /> Status to March 10, 1995 <br />
The URL can be used to link to this page
Your browser does not support the video tag.