My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994-HIGH SCHOOL BUILDING COMMITTEE
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL COMMITTEE
>
HIGH SCHOOL BUILDING
>
1990-1999
>
1994
>
1994-HIGH SCHOOL BUILDING COMMITTEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 11:25:51 PM
Creation date
11/17/2016 3:30:50 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
12/31/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Preestablished Constants Used in this Study: the cleaning time be extended to 180 minutes per 1000 <br /> 1. Prices for installed flooring materials and square feet, compared to 40 minutes per 1000 sq.ft. <br /> removal costs are derived from Atlanta based contract in the previous study. The increased maintenance time <br /> dealers. is the result of a trend toward more upscale commer- <br /> 2. Time rates (the average number of minutes re- cial interiors and an accompanying upgrade in clean- <br /> quired) and annual frequencies per task for maintain- ing expectations and service. Indeed, recent research <br /> ing 1,000 square feet of carpeted or hard surface floors has shown that proper and frequent cleaning <br /> were computed based on the BOMA study in section, significantly extends the use-life and appearance reten- <br /> "Workload Rates for Specific Tasks." Maintenance tion of interior furnishings. <br /> time and frequencies of this current study vary 3. For the purposes of carpet/hard surface com- <br /> significantly from the earlier ISC data. For example,the parisons,in this study, cost data was drawn from a <br /> previous study alloted 6 minutes per service for representative wet cleaning system for carpet because <br /> dustmopping hard surface floors at an annual frequen- wet cleaning is required in the maintenance of hard sur- <br /> cy of 216 days or 4 days per week;this new study, bas- face floors, thus coordinating more easily the com- <br /> ed on updated BOMA recommendations, allocates 10 parison results. <br /> minutes for dustmopping, and the basic service 4. Costs of cleaning supplies and equipment were <br /> assumes that this task will be performed 5 days per drawn from published price lists of established distribu- <br /> week. Regarding carpet cleaning, BOMA does not in- tion sources in the Atlanta area. Although upgraded <br /> clude a frequency recommendation, but Carpax ad- maintenance has resulted in increased cleaning times <br /> vises that office carpet be cleaned once per quarter, for all flooring products, the time required to clean <br /> as in the 1987 study. However, BOMA does advise that carpet has not increased as much as that of hard sur- <br /> FLOORCOVERiNG REMOVAL COST <br /> (Per Square Foot) <br /> $20 <br /> $15 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $15.00 <br /> $11.00 <br /> $10 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> i <br /> i <br /> tti <br /> $5 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . i <br /> $.33 $.84 <br /> $0 s. <br /> Commercial Vinyl Tile Ceramic Tile Wood Plank <br /> Carpet <br /> Source: Carpax Associates, Inc. Note: These cost can exhibit considerable variation <br /> Atlanta based Contract Dealers - 1991 dependent upon the particular situation. <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.