My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-HIGH SCHOOL BUILDING COMMITTEE
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL COMMITTEE
>
HIGH SCHOOL BUILDING
>
1990-1999
>
1995
>
1995-HIGH SCHOOL BUILDING COMMITTEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 7:16:08 PM
Creation date
11/17/2016 3:30:57 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
12/31/1995
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
schedule and by Stone' s financials, they are 4 weeks behind. <br /> Paul said early in the job it is a concern but you have to wait <br /> until the steel is up to say where they will be. <br /> Paul said today, for the first time, on the agenda is a <br /> discussion of contingency plan. He thinks the Committee should <br /> discuss this with Dr. DeMoura and Mr. Williams once each month. <br /> Paul believes , if the building is running behind schedule and not <br /> ready to open Sept. 1 , at least a portion - 1 wing can be ready <br /> for use. <br /> Dr. DeMoura asked if the contractor will allow occupancy of a <br /> portion of the building? <br /> Paul does not think it will be a problem. <br /> Dr. Demoura asked about providing a due date for equipment <br /> delivery when it goes out to bid. <br /> Paul said he will discuss steps that can be taken in regard to <br /> that. <br /> Bill said the Committee was advised early on that it was not a <br /> good idea to have construction going on while students are in the <br /> building. <br /> Paul said he has been thinking of things that can make it work. <br /> The work will be mostly finish work. There will be no site work <br /> going on. The exterior will be a finished building. <br /> The students can enter and exit from the bus drop off end of the <br /> building. <br /> They can punchlist that area of the building before occupancy. <br /> They can open without a cafeteria. Gym class can be outside. The <br /> completion of the building will be off by 1-2 months, not a long <br /> time. <br /> He suggested they can modify the furniture and equipment RFP so <br /> there is a line item for storage in case of delay. This cost <br /> will be part of their bid and the Committee can exercise that <br /> right if necessary. <br /> Paul asked Mr. Williams to prepare for the Committee the minimum <br /> requirements he can get by with for the 7 ,8 and 9th grades for 30 <br /> and 60 days. <br /> Paul will talk with Bill Hauck about the possibility of opening a <br /> portion of the building. <br /> Another key issue is getting the building closed in for the <br /> winter - getting a permanent structure up. <br /> Paul explained that a delay of one week for the steel is not <br /> equal to a delay 1 week later. Now the delay is preventing 100 <br /> men from working , it is a major delay. <br /> The commitment from Stone to double the crew is an important one <br /> and Paul would not accept anything less than that. <br /> 2 <br />