Laserfiche WebLink
figure came down to $18, 685 . The tasks included are: contract documents, <br /> specifications, change to the base building drawings - coordination , <br /> bidding- printing, administration, tabulation , mailing, construction <br /> administration. <br /> Construction administration covers a 4 week period total of 50 hours for a <br /> civil engineer. <br /> Paul thinks that is excessive, the entire job is only 160 hours. <br /> Joel explained the proposal is for site clearing and erosion control , they <br /> will install part of the storm drainage system. You can ' t clear without <br /> erosion control . <br /> Paul thinks is it slightly but not excessively high. It will buy the <br /> project 4-6 weeks. It may be the window needed if there is any work <br /> stoppage or weather problems . It is a small amount of money compared to <br /> paying overtime because the project is running late in the end. He feels <br /> it is money well spent, it buys insurance. <br /> Ian said the proposal seems on the high side. It is difficult to determine <br /> what amount might have been included in the original contract for this <br /> work. <br /> Joel explained for the civil engineer they determined what would have been <br /> needed under the basic services and subtracted that. They put a lot of <br /> thought into this proposal . <br /> ** Paul made a motion to ask SMMA to proceed with the additional <br /> package for clearing and grubbing , based on their proposal of <br /> $18, 685 . 00. Merry Sue seconded the motion. All members were in <br /> favor 6-0** <br /> Steve said it should be in the contract that the contractor keep the <br /> woodland loam on site - do not remove it. No topsoil is to be removed . <br /> Next Week's Agenda: <br /> Joel thinks Ed Frenette is prepared to bring in revised elevations. If <br /> they are not, the Committee would like to know ASAP so they can cancel the <br /> meeting . <br /> Paul suggested discussing the open items on technology: library, training , <br /> schedule of hiring staff, grounds equipment. He would like to see a <br /> schedule of what students will be in the building when . These issues have <br /> to be discussed with the School Committee also. The Committee should <br /> develop an action list. <br /> LAND ACQUISITION <br /> Paul said the title was transferred last week . Town Counsel said he felt <br /> it was a very comprehensive appraisal . It will be hard to bring it to court <br /> and claim it was a bad job. <br /> Ian presented a cash flow schedule for construction . <br /> Paul had reviewed it previously and made some comments. Ian will make <br /> those revisions. <br /> Ian said a letter was supposed to go to Town Counsel from SMMA regarding <br /> CCR's fee? <br /> Joel said it went out today. <br /> 9 <br />