My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-HIGH SCHOOL BUILDING COMMITTEE
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL COMMITTEE
>
HIGH SCHOOL BUILDING
>
1990-1999
>
1996
>
1996-HIGH SCHOOL BUILDING COMMITTEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 7:16:49 PM
Creation date
11/17/2016 3:31:01 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
12/31/1996
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
They are doing two things: assessing the existing conditions, for <br /> leaks , mold and developing a directive for Stone to implement. <br /> When Joel receives the final version, he will get copies to the <br /> Committee. <br /> Steve asked if Stone is doing a lot of mitigation already? <br /> Joel said they are. <br /> Merry Sue asked what systems are on? <br /> Joel said the big de-humidifier is running as well as 4-5 small <br /> ones , heat is running . <br /> Peter asked, after substantial completion, how do we get Stone to <br /> keep the de-humidifier going , after the flooring is down? <br /> He would like to see the dehumidifier running until Sept. 1 . <br /> Joel said contractually, Stone cannot be held to that . <br /> After substantial completion, it is the owner' s responsibility to <br /> run the mechanical systems. <br /> Peter said this summer there will still be a lot of moisture in <br /> the building, it the concrete . He does not want the carpet to be <br /> wet in August because we didn't get the moisture out . <br /> Joel said he can look into it but he is not sure how you can <br /> require it. <br /> ' Peter asked how much it will cost to run the dehumidifier for 1 <br /> month? <br /> Tom will find out. <br /> Janice said even it we have to pay for it it is to our advantage. <br /> CHANGE ORDERS <br /> Joel presented a change order for $19 , 383 for 6 items: <br /> - add plumbing piping in cafeteria for roof drain. <br /> - locate exhaust duct work in classroom Al , due to space <br /> restriction in corridor. <br /> - provide additional traffic signs throughout the site , <br /> recommended by the sign installer. <br /> - additional plumbing piping in science case work <br /> - additional filler fabric on leaching field at stp, asked for by <br /> Elias McQuaid. <br /> - add floor drain for dishwasher in nutrition lab. <br /> Peter asked why these are coming up now? <br /> Joel explained the vertical rise was now show on the plan for the <br /> cafeteria roof drain so it was added. <br /> Peter asked if we pay for architect' s time to design this? <br /> Joel said no. <br /> The duct work, the contractor asked to relocate it to allow more <br /> space in the corridor. SMMA agreed it worked better. The change <br /> in price is for the additional run of duct work. footage . <br /> Steve said all the changes will be reviewed at the end of the <br /> project to see who owns what . <br /> 2 <br />