My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-HIGH SCHOOL BUILDING COMMITTEE
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL COMMITTEE
>
HIGH SCHOOL BUILDING
>
1990-1999
>
1996
>
1996-HIGH SCHOOL BUILDING COMMITTEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 7:16:49 PM
Creation date
11/17/2016 3:31:01 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
12/31/1996
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MASHPEE HIGH SCHOOL BUILDING COMMITTEE MEETING MINUTES <br /> MONDAY, JULY 8, 19996 <br /> SENIOR CENTER <br /> Present: Paul Griffin, Merry Sue Ahlgren, Steve Greelish, Peter <br /> Dinizio <br /> Also Present: Jim Byrne <br /> The Committee reviewed the plans for the additional fields, road <br /> work and site lighting. <br /> This bid also includes irrigation of these fields. <br /> The fence is included in the base bid. It is an 8 ft fence <br /> around the perimeter of the football field with a 4 foot one <br /> around the inside of the track. <br /> Paul would like to see another gate added. <br /> The sidewalk along the entry is a requirement of the Cape Cod <br /> Commission. <br /> Lighting is for the football fields , basketball courts and tennis <br /> courts . <br /> The State wanted to see 4 lanes on Old Barnstable Road, so the <br /> design now includes 4 lanes . It required some takings . <br /> ** Paul made a motion to forward to the Selectmen for their <br /> approval the bid from PA Landers for additional site work <br /> to include additional fields, field lighting and road <br /> work, for $644 , 000 (Base bid plus 3 alternates) . Merry <br /> Sue seconded the motion. <br /> Discussion: <br /> Is the road work a good price? <br /> Paul said it is . <br /> ** All members were in favor 4-0** <br /> CCD #18 for the curtain for the auditorium, additional air <br /> conditioning for auditorium and lighting in the TV studio of <br />"{ $40,000. Paul explained that Joel feels the TV studio lighting is <br />;i an integral part of the job. <br /> 1 Steve said there is no way it should cost $40,000. We will have <br /> to do it when we do the other lighting. <br /> Merry Sue wants to see details . <br /> Paul said Joel feels it is important to do it asap. There are <br /> ceiling changes, pole rigging, a lot of circuits. He does not <br /> disagree with Steve, it is a lot of money. <br /> He will take $40 , 000 out of CCD #18. <br /> Paul suggested having Mike talk to the Committee about what <br /> lighting is required for each of these locations. <br /> Paul spoke with Manny Tavares today. He feels the 44 . 8 million <br /> will only be slightly under. It will depend on what we select <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.