My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-HIGH SCHOOL BUILDING COMMITTEE
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL COMMITTEE
>
HIGH SCHOOL BUILDING
>
1990-1999
>
1996
>
1996-HIGH SCHOOL BUILDING COMMITTEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 7:16:49 PM
Creation date
11/17/2016 3:31:01 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
12/31/1996
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
will clearly be done before Aug. 23rd. <br /> There is a mold problem in section E, on the first floor. They <br /> may have to remove some sheetrock. <br /> Sewage Treatment plant , the pumps will be here on June 17th. <br /> Woodard and Curran said we could use a high quality <br /> ejection/sludge pump, if necessary. We could also ask DEP for <br /> approval for pumping of a day tank. <br /> Paul asked how we resolve the problem of running the plant for 30 <br /> days with no use of the sewage system? <br /> Steve said for hydraulic flow testing, they will make sure the <br /> system hydraulically functions . They will "feed" it and it can <br /> be "seeded" . It can be on line for the workmen to use. They can <br /> then recycle it for 30 days , as long as they have something to <br /> work with. <br /> Paul said there are 2 target dates : <br /> - the contract dates of July 23 and Aug 23 <br /> - the realistic date of Sept 1 when the building needs to be open <br /> for students. <br /> There is more than enough time to finish this project, with time <br /> for furniture vendors and teacher move in. If we get stuck for <br /> time, we can shorten the vendor time and teacher set up time. <br /> That is better than setting up trailers and then moving again <br /> into this building . <br /> Joe asked if any other problems could happen with the waste water <br /> treatment plant? <br /> Steve said it could possibly run as a tight tank but you can' t <br /> run the plant in that mode, so the system would have to be shut <br /> down and then run it , which is a problem. It will cost $300 per <br /> day to pump it. The system has to be operating before 400 kids <br /> enter the building. He has a problem with a target date only 30 <br /> days away, he does not see it. <br /> Paul said, worst case , we could force Stone to work 24 hours a <br /> day. He spoke with Jim Rudnick from Liberty and told him the <br /> decision that has to be made about the trailers . He agreed we <br /> would force Stone to work overtime to finish it . <br /> If we get the trailers , equipment has to be moved into the <br /> trailers, then move it out again, and there will be significant <br /> legal costs. Mr. Rundich said this will become a major legal <br /> battle for the town. A lot can be spent on over time to finish <br /> the school that would otherwise be spent on legal costs. <br /> Paul ' s recommendation is to not get the trailers and go with the <br /> school . <br /> Steve said he has looked at the CPM and talked to the experts and <br /> toured the school . It isn't there, it can't be done. He doesn' t <br /> want to see the town be forced to take occupancy because we have <br /> no other choice. <br /> Paul said he has looked at the man hours to finish A,B & E and it <br /> is not a lot. <br /> Joe asked if they can get the building heated by next week? <br /> 3 <br />