My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/19/1996-MASHPEE HIGH SCHOOL BUILDING COMMITTEE MINUTES AND AGENDA
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
>
06/19/1996-MASHPEE HIGH SCHOOL BUILDING COMMITTEE MINUTES AND AGENDA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2021 11:38:43 AM
Creation date
11/17/2016 3:31:07 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
06/19/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEP-26-1995 17:51 P.03 <br /> foundations for this objective; <br /> • LD stated that information generated inside the high school must be able to be delivered to <br /> resources outside the high school and vis versa; <br /> • The cannon will continue to develop means of providing educational programming to <br /> students who might be house bound or hospital for different periods of time; <br /> • MP stated that next year negotiations with the smart cable provider,for new contractwill <br /> • LD explained the number of sigWfrcant resources available in this area,woods whale was <br /> used as an example. LD stated that it would be helpful to have ways to have access to such <br /> resources without having to Physically go to them; <br /> • Bidding, procurement,state blanket contracts and chapter 30 b were discussed. MP stated <br /> that be has concerns with regard to buying out different sections of technology. His concerns <br /> include the potential difficulty of integrating tecbnology pieces purchased from different <br /> vendors and the need to obtain longer tam warranties,service and support <br /> • JW discussed the need to haveconstantly available",and"rotating resources. Examples of <br /> constantly available resources would include encyclopedias and dictionaries while changing <br /> =on=might include special references to dinosaurs,geology,or weather. The implication <br /> for systems is that appropriate CD ROM access roust be provided to support both fixed and <br /> d=2gmg resources; <br /> • MP raised the requirement for the video projector in the auditorium. SG noted that there <br /> have been significant technology changes within the past yea. CCR will review the building <br /> construction documents and determine what is in the building and what will be addressed <br /> under this Project, <br /> • JW confirmed that we will specify faxes as required,per prior notes; <br /> • SG suggested and the group agreed,that we do not want all copy/output devices to be <br /> computer connected: <br /> • JW has had conversations with Wes Petit from Pin Patterson. Wes is forwarding <br /> prograuuniug information and layouts to JW. JW will bring them to the committee; <br /> • SG stated the requirement for fax delivery and receipt from computas and network; <br /> • MP raised the issue of"crows nesse"for camera locations in the gym_ These were deleted at <br /> one paint in the project. SG indicated that once the existing price request to the contactor <br /> ars received two crows nest may be opened. <br /> rnam,�vsms,.a <br /> CCR project Report Pg 3 <br /> TOTAL P.03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.