Laserfiche WebLink
SEP-26-1995 17:51 P.03 <br /> foundations for this objective; <br /> • LD stated that information generated inside the high school must be able to be delivered to <br /> resources outside the high school and vis versa; <br /> • The cannon will continue to develop means of providing educational programming to <br /> students who might be house bound or hospital for different periods of time; <br /> • MP stated that next year negotiations with the smart cable provider,for new contractwill <br /> • LD explained the number of sigWfrcant resources available in this area,woods whale was <br /> used as an example. LD stated that it would be helpful to have ways to have access to such <br /> resources without having to Physically go to them; <br /> • Bidding, procurement,state blanket contracts and chapter 30 b were discussed. MP stated <br /> that be has concerns with regard to buying out different sections of technology. His concerns <br /> include the potential difficulty of integrating tecbnology pieces purchased from different <br /> vendors and the need to obtain longer tam warranties,service and support <br /> • JW discussed the need to haveconstantly available",and"rotating resources. Examples of <br /> constantly available resources would include encyclopedias and dictionaries while changing <br /> =on=might include special references to dinosaurs,geology,or weather. The implication <br /> for systems is that appropriate CD ROM access roust be provided to support both fixed and <br /> d=2gmg resources; <br /> • MP raised the requirement for the video projector in the auditorium. SG noted that there <br /> have been significant technology changes within the past yea. CCR will review the building <br /> construction documents and determine what is in the building and what will be addressed <br /> under this Project, <br /> • JW confirmed that we will specify faxes as required,per prior notes; <br /> • SG suggested and the group agreed,that we do not want all copy/output devices to be <br /> computer connected: <br /> • JW has had conversations with Wes Petit from Pin Patterson. Wes is forwarding <br /> prograuuniug information and layouts to JW. JW will bring them to the committee; <br /> • SG stated the requirement for fax delivery and receipt from computas and network; <br /> • MP raised the issue of"crows nesse"for camera locations in the gym_ These were deleted at <br /> one paint in the project. SG indicated that once the existing price request to the contactor <br /> ars received two crows nest may be opened. <br /> rnam,�vsms,.a <br /> CCR project Report Pg 3 <br /> TOTAL P.03 <br />