Laserfiche WebLink
P.7 <br /> i, <br /> 3. Will the project generate sanitary sewage? Yes No_$_ I <br /> If Yes,Quantity: gallons per day <br /> Disposal by: (a) Onsite septic systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes No <br /> (b) Public sewerage systems. . . . . . .. . . . . . . . . . . . . . . . . .. . . .. . . . Yes No <br /> (c) Other means(describe) <br /> 4. Might the project result in an increase in paved or impervious surface over an aquifer recognized as an impor- <br /> tant present or future source of water supply? Yes No X <br /> Explanation and Source: <br /> 5. Is the project in the watershed of any surface water body used as a drinking water supply? <br /> Yes No x _ i <br /> Are there any public or private drinking water wells within a 1/2-mile radius of the proposed project? <br /> Yes No Presently not known X <br /> Explanation and Source: <br /> i <br /> t: <br /> t <br /> E <br /> 6. Might the operation of the project result in any increased consumption of water? Yes No <br /> Approximate consumption gallons per day.Likely water source(s) <br /> Explanation and Source: <br /> M� <br /> fl. . <br /> �I <br /> 7. Does the project involve any dredging? Yes No X <br /> If Yes,indicate: <br /> Quantity of material to be dredged <br /> Quality of material to be dredged <br /> Proposed method of dredging <br /> Proposed disposal sites <br /> Proposed season of year for dredging <br /> Explanation and Source: <br /> • � I <br /> -,i <br /> h <br /> I J <br />