Laserfiche WebLink
"F. No site for such use may have more than one (1) direct vehicle access way to <br /> Routes 28 or 151 or more than two (2) direct vehicle accesses to any other <br /> abutting street not created as part of the commercial center, and such access <br /> ways shall intersect the abutting street at a ninety (90) degree angle, unless the <br /> Planning Board approves a different intersection angle. Additional access <br /> ways may be approved by the Planning Board, where they are found to be <br /> necessary for reasons of safety or proper traffic flow. Where the commercial <br /> center will be subdivided into multiple lots, there shall be no separate vehicle <br /> access from any individual lot within the development onto Route 28, Route <br /> 151 or Great Neck Road North. <br /> i <br /> A traffic impact report, indicating projected traffic flows from the project at <br /> its buildout, projected traffic flows and levels of service on nearby roadways <br /> in 5 years and at buildout of the development, current traffic flows, levels of <br /> service and accident records for said roadways, projected capacity, service <br /> level and safety problems anticipated in 5 years and at project buildout, <br /> proposed mitigation measures and approximate costs in current dollars and <br /> other relevant information shall be submitted as part of the application and <br /> explained to the Board at a public meeting by a competent professional traffic <br /> engineer or transportation planner. The Planning Board may require traffic <br /> signals, traffic or turn lanes, sidewalks, bikeways or any other mitigation <br /> measures that it believes necessary to protect public safety and maintain <br /> proper traffic flow on roadways within or impacted by the development. <br /> Streets and drives within the development shall be constructed in accordance <br /> with the Planning Board's subdivision and special permit regulations, except <br /> that the Board may require additional sidewalks, traffic lanes, turn lanes, <br /> traffic signals or other items as necessary. Projected traffic may be calculated <br /> on the basis of firm projections of commercial uses and floor areas when <br /> available, on the basis of 166 average weekday trip ends per 1000 square feet <br /> of gross leasable floor area, or on shopping center vehicle trip generation rates <br /> contained in the latest edition of Trip Generation by the Institute of <br /> Transportation Engineers. In performing such calculations where there is no <br /> firm estimate of gross leasable floor area, estimated area shall be calculated <br /> based on twice the maximum lot coverage allowed for the project. <br /> Add the following new paragraphs to Subsection H: <br /> "The Planning Board shall require that a schedule of architectural, signage <br /> and/or landscaping controls be adopted for the development, enforceable by <br /> the Town's special permit authority as well as deed restrictions on the <br /> development and any lots to be sold, unless specific building, signage and <br /> landscape designs are submitted for all portions of the project. Such controls <br /> shall have the effect of promoting design that is in keeping with the character <br /> of the Town and of Cape Cod. <br /> Any proposed schedule of architectural, signage and landscaping controls <br /> shall require review by the Design Review Committee and its report to the <br />