Laserfiche WebLink
TOWN OF MASHPEE <br /> PETITION FOR ANNUAL TOWN MEETING TOV`4 OF MASHPEE <br /> To see if the Town will vote to amend the zoning bylaw to add the following new section 174T2�AN CLERK <br /> 11174-27.1 Stormwater Management. 99 JAN 21 PPS 3: 27 <br /> A. For any new residential or non-residential development requiring either subdivision approval, a special permit, plan <br /> review under the provisions of Subsection 174-24.B., or a building permit for a building over one thousand (1000) <br /> square feet in area (except for one-family dwellings on individual lots in existence on May 3, 1999 and their accessory <br /> structures a system of stormwater management and artificial recharge of precipitation shall be required which is <br /> designed to achieve the following purposes: prevent untreated discharges to wetlands and surface waters, preserve <br /> hydrologic conditions that closely resemble pre-development conditions, reduce or prevent flooding by managing the <br /> peak discharges and volumes of runoff, minimize erosion and sedimentation, not result in significant degradation of <br /> groundwater, reduce suspended solids, nitrogen,volatile organics and other pollutants to improve water quality and <br /> provide increased protection of sensitive natural resources. <br /> B.These standards may be met using the following or similar best management practices: <br /> (1) For lots occupied, or proposed to be occupied, by single or two-family residences, recharge shall be attained <br /> through site design that incorporates natural drainage patterns and vegetation in order to maintain <br /> pre-development stormwater patterns and water quality to the greatest extent possible. Stormwater runoff from E <br /> rooftops, driveways and other impervious surfaces shall be routed through vegetated water quality swales, as <br /> sheet flow over lawn areas or to constructed stormwater wetlands, sand filters, organic filters and/or similar <br /> systems capable of removing nitrogen from stormwater. <br /> i (2) For lots occupied or proposed to be occupied by other uses, a stormwater management plan which 1) utilizes site <br /> planning techniques to minimize runoff, 2) utilizes nonstructural techniques, including pollution prevention and <br /> source reduction,to minimize the type of treatment needed for stormwater and 3) provides for the artificial <br /> recharge of precipitation to groundwater through site design that incorporates natural drainage patterns and <br /> vegetation and through the use of constructed (stormwater)wetlands,wet(retention) ponds,water quality swales, <br /> sand filters, organic filters or similar site-appropriate best management practices capable of removing nitrogen <br /> and other contaminants from stormwater and meeting the Stormwater Management Standards and technical <br /> guidance contained in the Massachusetts Department of Environmental Protection's Stormwater Management <br /> Handbook,Volumes 1 and 2, dated March 1997, for the type of use proposed and the soil types present on the <br /> site. Such runoff shall not be discharged directly to rivers, streams, other surface water bodies, wetlands or <br /> vernal pools. Dry wells shall be prohibited. Except when used for roof runoff from non-galvanized roofs, all such <br /> wetlands, ponds, swales or other infiltration facilities shall be preceded by oil, grease and sediment traps or other <br /> best management practices to facilitate control of hazardous materials spills and removal of contamination and <br /> to avoid sedimentation of treatment and leaching facilities. All such artificial recharge systems shall be <br /> maintained in full working order by the owner(s) under the provisions of an operations and maintenance plan <br /> approved by the permitting authority to assure that systems function as designed. Infiltration systems greater <br /> than three (3)feet deep shall be located at least one hundred (100)feet from drinking water wells. Any <br /> infiltration basins or trenches shall be constructed with a three (3) foot minimum separation between the bottom <br /> of the structure and maximum groundwater elevation. <br /> fission of sufficient plans and specifications to demonstrate the <br /> C.The permitting authority shall require the submission p p <br /> operation and effectiveness of the proposed stormwater management facilities and practices and shall require their <br /> implementation and maintenance, including provisions for deed restrictions and other implementing provisions, as a r; <br /> condition of approval of the proposed development. No permit may be approved for a development unless the <br /> permitting authority determines in writing that the proposed system of stormwater management and artificial <br /> recharge will achieve the purposes described in subsection A." <br /> r- <br /> or take any other action related thereto. <br /> We,the undersigned,are qualified voters of Mashpee,and in accordance with the provisions of law,request <br /> this petition be put on the Warrant for the Annual Town Meeting. <br /> Si ature Street Address Town Precinct <br /> azo 0 ,pm <br /> v -71 ft cc_cL,.,-e" W <br /> j/ / cc✓'�G,.t"d l �� <br /> I certify that the ten (10) above signatures are that of registered voters in Mashpee. <br />