Laserfiche WebLink
Utilization of Facility Improvement Funds <br /> 1991 -2001 <br /> Year Work Done <br /> 1991, 92, 93 Third Floor renovation academic area <br /> 1994 Storage building in compound <br /> Design work re/library relocation <br /> Relocate D.E. and Computer Tech <br /> Rebuild gym bleachers to incorp. Safety features <br /> Major drape replacement <br /> Replace lights in gym <br /> Upgrade fire alarm system <br /> 1995 Resurface athletic track <br /> Major locker repairs/upgrade in all areas <br /> Rebuild areas of septic system <br /> Incremental roof program <br /> Waterproof rear side of building <br /> Start Library renovation —completed 1996 <br /> Replace carpeting Principal's/Business Offices <br /> 1996 Completion of library relocation <br /> Dental Lab establishment <br /> Blacktop roadway and front circle <br /> Repairs to gym divider <br /> 1997 Incremental blacktop program <br /> Replacement underground oil tanks <br /> HVAC duct replacement lower level <br /> Replacement of ceilings regarding duct replacement <br /> Engineering fees regarding replacement oil tanks <br /> Replace sound systems in all areas of building <br /> 1998 Continuation of HVAC Duct replacement and ceilings <br /> F <br /> Relocate Marine and Welding shops <br /> Expansion of electrical and plumbing shops <br /> Blacktop incremental program ; <br /> 1999 Replacement of Electrical panels commons and stage lighting ' <br /> Window replacement mall upper windows <br /> Replacement of HVAC ducts commons, principal's and business office areas <br /> 7. <br /> J <br />