My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1980-1981-ZBA APPEALS - BLACKBOOK
TownOfMashpee
>
Town Clerk
>
Minutes
>
ZONING BOARD OF APPEALS
>
1980-1989
>
1981
>
1981
>
1980-1981-ZBA APPEALS - BLACKBOOK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2023 3:13:30 PM
Creation date
11/17/2016 3:37:24 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P. 7 <br /> 3. Will the project generate sanitary sewage? Yes Y— No <br /> If Yes,Quantity: 330 gallons per day <br /> Disposal by: (a) Onsite septic systems . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . Yes X No <br /> (b) Public sewerage systems . . . . . . . . . . . . . . . : . . . . . . . . . . . . . . . . . Yes No <br /> (c) Other means(describe) <br /> 4. Might the project result in an increase in paved or impervious surface over an aquifer recognized as an impor- <br /> tant present or future source of water supply? Yes X No <br /> Explanation and Source: The ground crater is thought to be a continuous <br /> surface so that the ground water here surely serves a well towards the south. <br /> 5. Is the project in the watershed of any surface water body used as a drinking water supply? <br /> Yes No X <br /> Are there any public or private drinking water wells within a 1/2-mile radius of the proposed project? <br /> Yes X No <br /> Explanation and Source: There is no To,.,,n municipal :rater system in Hashpee. <br /> There are several buildings within z mile. All must be served_ by wells. <br /> 6. Might the operation of the project result in any increased consumption of water? Yes X No <br /> Approximate consumption 330 gallons per day.Likely water source(s) orival we Ll <br /> Explanation and Source: The estimated water consumption is based on a high <br /> usage for a commercial building. The consumption will increase -,,hen more <br /> buildings are constructed. <br /> 7. Does the project involve any dredging? Yes No X <br /> If Yes,indicate: <br /> Quantity of material to be dredged <br /> Quality of material to be dredged <br /> Proposed method of dredging <br /> Proposed disposal sites <br /> Proposed season of year for dredging <br /> Explanation and Source: <br />
The URL can be used to link to this page
Your browser does not support the video tag.