Laserfiche WebLink
P. 9 <br /> 1. Solid Waste <br /> 1. Might the project generate solid waste? Yes X No <br /> Explanation and Source: <br /> (Estimate types and approximate amounts of waste materials generated, e.g., industrial, domestic, hospital, <br /> sewage sludge,construction debris from demolished structures.) <br /> The bank building gill generate approximately two tons per year. The <br /> residential development irill generate about forty—£our tons per year when <br /> the project is completely developed. <br /> J. Aesthetics <br /> 1. Might the project cause a change in the visual character of the project area or its environs? <br /> Yes '{ No <br /> Explanation and Source: The existing woods are primarily pitch pine which is <br /> not generally considered an attractive species. Some people mould prefer <br /> the woods be undisturbed. <br /> 2. Are there any proposed structures which might be considered incompatible with existing adjacent structures <br /> in the vicinity in terms of size, physical proportion and scale,or significant differences in land use? <br /> Yes No X <br /> Explanation and Source: The surrounding land is generally undeveloped except <br /> for the Neta Seabury Shopping Center and several building across the street. <br /> The bank building will be a much smaller scale than the Shooping Center and <br /> will be similar in scale to the building across Route 28. <br /> 3. Might the project impair visual access to waterfront or other scenic areas? Yes No X <br /> Explanation and Source: <br /> No crater Front exists. <br /> No vistas exist. <br /> Wind and Shadow <br /> 1. Might the project cause wind and shadow impacts on adjacent properties? Yes No X <br /> Explanation and Source: <br /> The project will be located in about the middle of the frontage on P.oute 28 <br /> several hundred feet from abutters. <br />