Laserfiche WebLink
s <br /> P. O. aox 1108 <br /> �... MASHPEE. MA 02649'-'.- .. <br /> SPECIAL PLANNING BOARD MEETING MINUTES : 11/28/84 Page 2 <br /> the petitioner to combine them. Mr. Dubin said he 'll call them to combine <br /> i . <br /> the 4 lots and bring in a new ANR olan. <br /> P�tr. Jonas asked Atty. Reardon about the ballpark down Shields Lane . <br /> -explained how the Board had asked them to move the ballpark as it was <br /> in a hole . They did move it, but now Ptr. Jonas discovered it 's in a <br /> worse hole and wanted to know if they can make them put it back. <br /> Atty. Reardon said they could. Mr. Rowley said the Board could require <br /> them to build the ballparkq and they would have the problem of filling in <br /> the hole to build it. <br /> Tom Fudala said there 's also a problem of the. lots at the entrancebeing <br /> in a C-1 area and he doesn't think they have enough lot size . <br /> The Eoard decided to require the park be built before they release the <br /> covenant . 74r. Rowley would examine the site and the Board will decide <br /> if a letter should be sent at the next meeting. <br /> ^he Eoard discussed the Waquoit Bay buffer article . Mr. Marsters wanted <br /> it reamended to just include area Do ' from wetlands within the ACEC . Mr.. <br /> �>>bin wanted it reamended to change the word "lot" to "land" . <br /> r. Jonas made a motion to authorize iJr. Fudala to make the requested <br /> changes . ::r. _ arsters seconded it and all voted in favor. <br /> r. ' arsters .nada a motion that the Chairman support the azticle on torm <br /> meeting, floor for a secretary for the Town Planner. -ir. Jonas seconded <br /> it and a111 voted in fa-ror. <br /> r. Dubin as*ed the members to review all past minutes since .a; and be <br /> prerared to approve or correct them at the next meeting. NMr. Dqb# said <br /> ne would inform 7ichele Stone . <br /> 2owley said he inspected Sea _-•aFs and there wasn't a grade stake to <br /> be found , =:e told them to .get in touch with their engineer to see if the <br /> grade, is okay. `-ie said they still have landscaping to do , but have done-, " <br /> some . <br />