Laserfiche WebLink
.a.. _,. <br /> TIIfun of c II5h�1PP _ __ <br /> f, <br /> P. O. BOX 1108 <br /> ' _.. MASHPEE. MA 02849--" .. <br /> SPECIAL PLANNING BOARD _MEETING MINUTES: 11/28/84 Page 2 <br /> the petitioner toYcombine them. Mr. Dubin said he 'll call them to combine <br /> the 4 lots and bring in a new ANR olan. <br /> 6'r. Jonas asked Atty. Reardon about the ballpark down Shields Lane . r <br /> :;e_explained how the Board had asked them to move the ballpark as it was <br /> in a hole . They did move it, but now Mr. Jonas discovered it 's in a <br /> worse hole and wanted to know if they can make them put it back. <br /> Atty. Reardon said they could . Mr. Rowley said the Board could require <br /> them to build the ballpark and they would have the problem of filling in <br /> the hole to build it . <br /> Tom Fudala said there 's also a problem of the. lots at the entrance being <br /> in a C-1 area and he doesn't think they have enough lot size . <br /> The Board decided to require the park be built before they release the <br /> covenant . '"r. Rowley would examine the site and the Board will decide <br /> if a letter should be sent at the next meeting. <br /> The Board discussed the Vaquoit Bay buffer article , Mr. Marsters wanted <br /> it reamended to just include area 50' from wetlands within the ACEC . Mr., <br /> in wanted it reamended to change the word "lot" to "land" . <br /> _ . Jonas made a motion to authorize M r. ?udala to make the requested <br /> changes . ::r. 71arsters seconded it and all voted in favor. <br /> r "arsters made a motion that the Chairman support the article on town <br /> meeting floor for a secretary for the Town Planner. cir. Jonas seconded <br /> it and all voted __ fa-ror. <br /> Dubin as;red the me^bars to review all Hast minutes since i.-a; and be <br /> Urenared to aoarove or correct them at "ne next meeting. 111r. Du said <br /> na would inform :ichele Stone . <br /> : r Pcwley said he inspected Sea '-a--s and there wasn 't a .grade stake to <br /> be found . _:e told them to .get in touch with their engineer to see if the <br /> grade- ,is okay. ; e said they still have landscaping to do , but have done,- ` <br /> some . <br />